Masen center

  • Project type : New Construction
  • Building Type : Other building
  • Construction Year : 2015
  • Delivery year : 2017
  • Climate zone : [Csa] Interior Mediterranean - Mild with dry, hot summer.
  • Net Floor Area : 5 500 m2
  • Construction/refurbishment cost : 11 000 000 €
  • Number of none : 7 none
  • Cost/m2 : 2 000 €/m2
  • Cost/none : 1 571 429 €/none


Moderated by : Alexia ROBIN

Similar case studies

Basuna Mosque

The Basuna Mosque is located in the hot & arid village of Basuna, Sohag, Egypt, over a site amidst a noisy, dusty and densely constructed area with encroaching residential buildings, a cemetery, cattle frequently moving back and forth (...)

Kaza Eco-Community Centre

In partnership with the Spiti Projects Charity, the Auroville Earth Institute has designed and built theKaza Eco- Community Centre with key participation of villagers in Kaza and local earth craftsmen of the Spiti Valley. The centre (...)

Maison des Yvelines - Nubian Vault

This amazing Nubian Vault* building, inaugurated on Dec 4th 2016, is one of AVN's major recent achievements in Senegal. Financed in part by the French Conseil Départemental des Yvelines, in collaboration with the NGO Le Partenariat (...)


Testimonials


Comments


  • Published on 06 December 18
    by La rédaction C21|Maroc
    Viewed 1054 times


  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Hot Climates
    Low Carbon
    Users' Choice


    Coherence with the local policy of planning and sustainable development of the territory:

    Justification according to the operation of taking into account the issues of sustainable urban development, especially with regard to the rational exploitation of networks or resources available locally (energy, renewable energy, water, sanitation), and with a view to minimizing the new constraints (waste, infrastructure maintenance, services). The project itself contributes to the sustainable development of the site: construction of a solar complex in the Ouarzazate desert. The operation is located on a desert plot, 10 km from the city of Ouarzazate and does not exploit existing networks. Masen integrates in its policy the study of the environmental impacts on the site and the surroundings of its projects and identifies the measures to be put in place.


    Certification Scheme


    Location

    route de Tasselmante , 45000 Ouarzazate Maroc

    Technicals Features