SEMI OLYMPIC SWIMMING POOL COVERED IN SIDI YOUSSEF BEN ALI

  • Project type : New Construction
  • Building Type : Swimming pool
  • Construction Year : 2016
  • Delivery year : 2018
  • Climate zone : [Cbc] Mild, dry winter, warm and wet summer.
  • Net Floor Area : 1 845 m2
  • Construction/refurbishment cost : 1 524 818 €
  • Number of Shower/day : 720 Shower/day
  • Cost/m2 : 826 €/m2
  • Cost/Shower/day : 2 118 €/Shower/day


Moderated by : Assia GOUDA

Similar case studies

London Aquatic Center

Abstract ‘Legacy’ is the concept that underlies the sustainability agenda of the London 2012 Olympic and Paralympic Games, embracing temporary infrastructure and venues to leave behind a vibrant, productive community with world-class (...)

"Murs à pêches" Pool

Construction of a swimming pool including:a fun pool and learning center 400 m2,a small play area 40 m2a river running 212 m2play area for toddlers 75 m2a large wellness area with pool 154 m2, steam room, sauna, spaa restaurantan outd (...)

Aquatic Center Champsaur

This aquatic center was created from the old village pool which only worked in the summer: it is now ope all year long as it is roofed now. To reduce energy consumptions, the principles of bioclimatic architecture have been met:passiv (...)


  • Published on 17 June 19
    by Anass Amazirh|Maroc
    Viewed 1184 times


  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Hot Climates
    Users' Choice


    This building responds in several points to the principles of sustainable development:

    The installation of a light timber frame glued laminated

    Structure and decking thus significantly reducing the dimensions of reinforced concrete columns with a span of 28 m

    Insulation of exterior walls, roof with extruded polystyrene XPS

    Insulation of the walls of the swimming pool, the beach, the water cover with sprayed polyurethane and insulation of all ventilation and plumbing ducts.

    Installation of smoke vents on the roof, to reduce the use of electric lighting during the day and reduce the use of electric lighting the day

    Use of PAC heat pumps for hot water production in the swimming pool

    12 solar panels for hot water production (showers)

    Use of LED lighting equipment

    Use of showerheads and sinks to reduce water consumption and flush toilets with two tank capacities

    Creating a well for watering the garden

    The treatment and disinfection of the pond water by ultraviolet treatment and sand filter


    Location

    Sidi Youssef Ben Ali , 40000 Marrakech Maroc

    Technicals Features