Mohammed bin Rashid Space Centre

  • Project type : New Construction
  • Building Type : Office building < 28m
  • Construction Year : 2016
  • Delivery year : 2016
  • Climate zone : [BWh] Subtropical dry arid
  • Net Floor Area : 411 m2
  • Construction/refurbishment cost : 1 000 000 €
  • Number of Work station : 1 Work station
  • Cost/m2 : 2 433 €/m2
  • Cost/Work station : 1 000 000 €/Work station


Moderated by : Sylvain Bosquet

Similar case studies

My Republic Plaza (Green Office Park 6)

​My Republic Plaza (Green Office Park6) is located in foot print area amounted 12,890 m2 has five floors for work space and basement. It also becomes one of part in Green Office Park BSD City which built base on Green Building Concept (...)

Office Building of Hebei building science and technology research and Development Center

​<span lang="EN-US" style='background: white; color: rgb(34, 34, 34); font-family: "Arial","sans-serif"; font-size: 10.5pt; mso-bidi-font-size: 11.0pt; mso-fareast-font-family: 宋体; mso-fareast-theme-font: minor-fareast; mso-ansi-language: EN-US; mso-fareast-language: ZH-CN; mso-bidi-language: AR-SA;'>The total construction area is 14527.17m2, underground area is 2164.87m2,6 floors area is 12362.3m2, the height of building is 23.55m, concrete framestructure, designed seismic intensity is 6 degrees;<span lang="EN-US" style='background: white; color: rgb(34, 34, 34); font-family: "Arial","sans-serif"; font-size: 10.5pt; mso-bidi-font-size: 11.0pt; mso-fareast-font-family: 宋体; mso-fareast-theme-font: minor-fareast; mso-ansi-language: EN-US; mso-fareast-language: ZH-CN; mso-bidi-language: AR-SA;'>Use features: the building is (...)

6 Pancras Square

​BNP Paribas Real Estate presents 6 Pancras Square next to Saint Pancras station. The building was designed by Jean-Michel Wilmotte and will be developed by BNP Paribas Real Estate Property Development UK.The project comprises of offi (...)


  • Published on 08 June 17
    by Camille Sifferlen|International
    Viewed 5187 times


  • Contest

    Green Solutions Awards 2017 - Buildings

    Energy & Hot Climates
    Low Carbon
    Health & Comfort
    Smart Building
    Users' Choice


     

    - Self-sufficient and completely independent of the electricity grid
    - Interior temperature ranges from between 22°C and 25°C in all seasons and times
    - Energy consumption reduced by 80% compared to existing buildings (700kWhpe/m²a) and 50% compared to Dubai Greenbuilding Regulations (280-300kWh/m²a) thanks to Passive House strategies, smart technical and engineering solutions
    - Prefabricated timber frame structure (eco-friendly processed wood)
    - Constructed in less than 100 days
    - Smart management and control system which interacts with the changes of the external heat and humidity
    - Ongoing research (how to transform high humidity to a water source cost effectively, link the project with Dubai’s electricity grid)


    Certification Scheme


    Location

    , 21183 Dubai United Arab Emirates

    Technicals Features