Mohammed bin Rashid Space Centre

  • Project type : New Construction
  • Building Type : Office building < 28m
  • Construction Year : 2016
  • Delivery year : 2016
  • Climate zone : [BWh] Subtropical dry arid
  • Net Floor Area : 411 m2
  • Construction/refurbishment cost : 1 000 000 €
  • Number of Work station : 1 Work station
  • Cost/m2 : 2 433 €/m2
  • Cost/Work station : 1 000 000 €/Work station


Moderated by : Sylvain Bosquet

Similar case studies

City Hall Venlo

The brief for the new City Hall presented a unique challenge in the form of stringent sustainability requirements set by Venlo municipality, which is the first region in the world to seek full implementation of the Cradle-to-Cradle (...)

CLT multicomfort office building

In March 2014, Tecto Arhitectura was appointed to design the new office building for HSR factory in Reci, Covasna, as the first large scale project with CLT structure in south-east Europe. The main challenge was to create an office (...)

Oficinas Santa Catarina ( FINSA offices )

The new FINSA offices are situated within the FINSA Industrial Park of Santa Catarina, which is strategically located in northern Mexico with easy access to central Mexico and Texas. The industrial park serves a variety of industries (...)


  • Published on 08 June 17
    by Camille Sifferlen|International
    Viewed 4896 times


  • Contest

    Green Solutions Awards 2017 - Buildings

    Energy & Hot Climates
    Low Carbon
    Health & Comfort
    Smart Building
    Users' Choice


     

    - Self-sufficient and completely independent of the electricity grid
    - Interior temperature ranges from between 22°C and 25°C in all seasons and times
    - Energy consumption reduced by 80% compared to existing buildings (700kWhpe/m²a) and 50% compared to Dubai Greenbuilding Regulations (280-300kWh/m²a) thanks to Passive House strategies, smart technical and engineering solutions
    - Prefabricated timber frame structure (eco-friendly processed wood)
    - Constructed in less than 100 days
    - Smart management and control system which interacts with the changes of the external heat and humidity
    - Ongoing research (how to transform high humidity to a water source cost effectively, link the project with Dubai’s electricity grid)


    Certification Scheme


    Location

    , 21183 Dubai United Arab Emirates

    Technicals Features