  • Project type : New Construction
  • Building Type : Office building < 28m
  • Construction Year : 2016
  • Delivery year : 2016
  • Climate zone : [BWh] Subtropical dry arid
  • Net Floor Area : 411 m2
  • Construction/refurbishment cost : 1 000 000 €
  • Number of Work station : 1 Work station
  • Cost/m2 : 2 433 €/m2
  • Cost/Work station : 1 000 000 €/Work station


Moderated by : Sylvain Bosquet

Similar case studies

City Hall Venlo

The brief for the new City Hall presented a unique challenge in the form of stringent sustainability requirements set by Venlo municipality, which is the first region in the world to seek full implementation of the Cradle-to-Cradle (...)

King Hussein Business Park – Building Four

The King Hussein Business Park (KHBP) is strategically located adjacent to one of Amman’s busiest highways, offering easy access to downtown and other cities in the region. Situated in the heart of the business park, Building Four (...)

Studio Bruno Stagno Architect

The building is located in a neighborhood of San José, Costa Rica, whose buildings date back to the second half of the 20th century.The vast majority of them are houses, but some of them have been transformed into shops and offices (...)


  • Published on 08 June 17
    by Camille Sifferlen|International
    Viewed 6004 times


  • Contest

    Green Solutions Awards 2017 - Buildings

    Energy & Hot Climates
    Low Carbon
    Health & Comfort
    Smart Building
    Users' Choice


     

    - Self-sufficient and completely independent of the electricity grid
    - Interior temperature ranges from between 22°C and 25°C in all seasons and times
    - Energy consumption reduced by 80% compared to existing buildings (700kWhpe/m²a) and 50% compared to Dubai Greenbuilding Regulations (280-300kWh/m²a) thanks to Passive House strategies, smart technical and engineering solutions
    - Prefabricated timber frame structure (eco-friendly processed wood)
    - Constructed in less than 100 days
    - Smart management and control system which interacts with the changes of the external heat and humidity
    - Ongoing research (how to transform high humidity to a water source cost effectively, link the project with Dubai’s electricity grid)