London Aquatic Center

  • Project type : New Construction
  • Building Type : Swimming pool
  • Construction Year : 2012
  • Delivery year : 2012
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 42 866 m2
  • Construction/refurbishment cost : 331 000 000 €
  • Number of Shower/day : 17 500 Shower/day
  • Cost/m2 : 7 722 €/m2
  • Cost/Shower/day : 18 914 €/Shower/day


Moderated by : Sylvain Bosquet

Similar case studies

Aquatic Center Champsaur

This aquatic center was created from the old village pool which only worked in the summer: it is now ope all year long as it is roofed now. To reduce energy consumptions, the principles of bioclimatic architecture have been met:passiv (...)

"Murs à pêches" Pool

Construction of a swimming pool including:a fun pool and learning center 400 m2,a small play area 40 m2a river running 212 m2play area for toddlers 75 m2a large wellness area with pool 154 m2, steam room, sauna, spaa restaurantan outd (...)


  • Published on 04 June 18
    by Pauline RIVOIRARD|International
    Viewed 1503 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2018 - Buildings

    Low Carbon
    Users' Choice


    ​The London Aquatic Center symbolizes the environmental approach of the organizer: build permanent structures if they can be used after the event or temporary, where appropriate. Thus, only the central part (2,500 places) is preserved as Olympic legacy. The wings, which offeredadditional capacity of 15 000 seats, are today dismounted. Composite materials used for the roof and outer walls have been removed, packaged and shipped at Texyloop, to generate raw materials of second low environmental impact generation. [non final version]

    Certification Scheme


    Location

    Olympic Park , E20 2ZQ London United Kingdom