Kuggen. Ecopilot, energenious building automation system

  • Project type : Renovation
  • Building Type : Office building < 28m
  • Construction Year : 2011
  • Delivery year : 2014
  • Climate zone : [Dfc] Wet subarctic, cool summer, severe winter
  • Net Floor Area : 4 898 m2
  • Construction/refurbishment cost : 50 000 €
  • Number of Work station : 1 Work station
  • Cost/m2 : 10 €/m2
  • Cost/Work station : 50 000 €/Work station


Moderated by : Sylvain Bosquet

Similar case studies

China Academy of Building Research NZEBuilding

​The nearly zero energy building (NZEB) at the China Academy of Building Research (CABR) adhered to the design principle of "passive building, proactive optimization, economic and pragmatic". An ambitious annual energy consumption (...)

VELUX China Headquarters

VELUX Langfang Office is the headquarters of VELUX China. Located in the Hebei province, around 45 kilometers from Beijing, the building houses management, marketing and the technical department and sales division.The two-storey build (...)

Administration of nature and forests

A sustainable, environmentally friendly planning concept played a crucial role in this new build for the Luxembourg Nature and Forestry Agency. This energy-plus building, which can produce more energy than it consumes, is one of the (...)


Testimonials


Comments


  • Published on 30 June 15
    by Ulf Falkenby|International
    Viewed 8211 times
  • Proposed by :




  • Contest

    Green Building Solutions Awards 2015

    Low energy renovation
    Smart Buildings


    Our unique product – Ecopilot

    Ecopilot is a new system with integrated control of ventilation, heating and cooling. Ecopilot functions brilliantly,both for new production and existing properties where we over-modulate existingequipment. The system particularly takes into account heat storage in thebuilding and thereby counteracts the need of, in a short duration, alternatingfrom heating to cooling, and vice versa. So the point is that the systemresults in “calmer” control, which in turn leads to reduced energy consumption,lower heating and cooling power needs and retained or improved quality of theindoor climate. There are currently approximately 320 installed Ecopilots. Formore information about the product and our customers, please logon toecopilot.com