ALFARO LAIF

  • Project type : New Construction
  • Building Type : Isolated or semi-detached house
  • Construction Year : 2019
  • Delivery year : 2019
  • Climate zone : [Cwa] Mild, dry winter, hot and wet summer.
  • Net Floor Area : 95 m2
  • Construction/refurbishment cost : 53 824 €
  • Number of Dwelling : 5 Dwelling
  • Cost/m2 : 567 €/m2
  • Cost/Dwelling : 10 765 €/Dwelling


Moderated by : Clément Gaillard

Similar case studies

First passive house in Brazil

First construction in Brazil built according to the international Passive House standard and financed by the Bundesministerium für Bildung und Forschung – BMBF (German ministry of Education and Research) in partnership with SENAI (...)

Passive House Drumderry

The project brief was to design a CertifiedPassive House on a sloping site in Drumderry. The dwelling is approached frombelow. This family Bungalow achieved Passive House Certification and the Bungalow also has a Irish BER of A1 @ (...)

medano passivhaus

​first nzeb in the canary islands built with passivhaus standars. the house reuses water for irrigation. Isolations are made with light lime.


  • Published on 10 June 19
    by david medina|International
    Viewed 706 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Hot Climates
    Low Carbon
    Users' Choice


    • Energy efficiency: no cooling system + solar thermal system
    • Low cost for a passive house: 567 €/m2
    • Good confort: ventilation

    Certification Scheme


    Location

    ARAMAR 101 , 66036 FRACC CUMBRES LA RIOJA, GARCÍA NL Mexico

    Technicals Features