Waldhorn Residence
- by Emeline GROSJEAN
- /
- 2019-06-14 10:53:55
- /
- France
- /
- 4866 / FR
New Construction
- Building Type : Collective housing < 50m
- Construction Year : 2018
- Delivery year : 2018
- Address 1 - street : 26-28 rue Hatt 67200 STRASBOURG, France
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 3 498 m2
- Construction/refurbishment cost : 4 215 143 €
- Number of Dwelling : 57 Dwelling
- Cost/m2 : 1205.02 €/m2
Certifications :
-
Primary energy need :
36 kWhep/m2.an
(Calculation method : RT 2012 )
For this program, Boulle has already won a national call for projects from ADEME "Towards responsible buildings by 2020." The building incorporates an innovative heat recovery solution on which BOULLE collaborates with a consortium of industrialists, a research laboratory and design offices.
The construction method of this project is as follows: exterior sails made of concrete and bricks, external thermal insulation, double glazing with reinforced insulation, single flow ventilation.
Air heat recuperators extracted from the ventilation system, as well as greywater, have been installed in addition to solar thermal panels. Thus, 100% of the hot water needs and 50% of the heating needs are covered by the system. The district heating network will be used.
Sustainable development approach of the project owner
Boulle is a pioneer in sustainable development, and always wants to be ahead of the national thermal regulations. BOULLE's desire was to make a BEPOS building without energy production by photovoltaic solar panels, the goal was to save and recover energy instead of producing it. We wanted to obtain an E + C label with the Energy 3 and Carbon 2 levels. This is our first building under this label. But it's not our first green building. Indeed, we realized an eco-district, The Willerbuehl, with bioclimatic houses, and an ecobioresidence in Meistratzheim, "Au Vieux Ruisseau". This project is different from the others realized so far because it is a call for projects from ADEME, and because we worked directly with the manufacturer who implemented the technical solution. Indeed, to design a project directly with the industrialist is innovative. It is the first residential building in France to be at this level of energy performance without photovoltaic.
Architectural description
For this program, Boulle has already won a national call for projects from ADEME "Towards responsible buildings by 2020." The building incorporates an innovative heat recovery solution on which BOULLE collaborates with a consortium of industrialists, a research laboratory and design offices. The construction method of this project is as follows: concrete sails and bricks, external thermal insulation, double glazing with reinforced insulation, single flow ventilation. Air heat recovery units extracted from the VMC, as well as on greywater have been installed, in addition to solar thermal panels. Thus, 100% of the DHW needs and 50% of the heating needs are covered by the system. The district heating network will be used.
See more details about this project
https://www.lemoniteur.fr/article/un-projet-pionnier-du-bas-carbone-a-strasbourg.739819Photo credit
Boulle
Contractor
Construction Manager
Stakeholders
Thermal consultancy agency
Tribu Energie
Other consultancy agency
GLM Fluides
Contracting method
Off-plan
Urban environment
Reasons for participating in the competition(s)
- Solution innovante de récupération de chaleur
- Récupérateurs de chaleur sur air extrait de la VMC, ainsi que sur les eaux grises
- Panneaux solaires thermiques
- Appoint par le réseau de chaleur du quartier
Building candidate in the category

Low Carbon

Users' Choice
Author of the page
Emeline GROSJEAN
Responsable de programmes
Other case studies

Thermic renovation of a guard house with baked clay
- 17/03/2023
- /
- Taman Mhoumadi
- /
- 835

Townfield Head Farm
- 13/03/2023
- /
- Mark Woodward
- /
- 762

Public housing in Tarm
- 13/03/2023
- /
- Asta Justesen
- /
- 847

The Danish Nature Agency's official residence in Thy
- 13/03/2023
- /
- Asta Justesen
- /
- 737

Rådhuslunden_City hall grove
- 13/03/2023
- /
- Asta Justesen
- /
- 744

The Phenix
- 13/03/2023
- /
- Lemay
- /
- 669