Technopole

  • Project type : New Construction
  • Building Type : Office building < 28m
  • Construction Year : 2016
  • Delivery year : 2017
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 18 000 m2
  • Construction/refurbishment cost : 53 547 000 €
  • Number of Work station : 550 Work station


Moderated by : Sylvain Bosquet

Similar case studies

City Hall Venlo

The brief for the new City Hall presented a unique challenge in the form of stringent sustainability requirements set by Venlo municipality, which is the first region in the world to seek full implementation of the Cradle-to-Cradle (...)

Green Lighthouse

​Green Lighthouse is Denmark’s first public carbon-neutral building. The building has been built in less than a year in a close public/private partnership.Green Lighthouse is an energy-efficient building of great architectural merit (...)

Mohammed bin Rashid Space Centre

​Baptized "UAE's first sustainable autonomous house", this new office building in Dubai, was realized in 2016 as a pioneering “pilot project” for MBRSC, a governmental research body. It is the first one to obtain the certification (...)


  • Published on 15 June 18
    by Thierry DJAHEL|France
    Viewed 4080 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2018 - Buildings

    Smart Building
    Users' Choice


    Technopole integrates many of Schneider Electric's leading technologies, including EcoStruxure for Buildings, its architecture and its building-specific platform for mass deployment of IoT solutions. It is a real showcase of the company's know-how.

    EcoStruxure for Buildings, Technopole Conductor

    EcoStruxure for Buldings is being implemented within Technopole. It integrates the most advanced and innovative technologies, through the 3 layers:

    • Connected products such as controllers, sensors, valves as well as offers for current measurement, smart electrical panels, etc. This layer also supports third-party connected products.

    • Edge control with EcoStruxure Building Management solution for operations management and more specifically, energy, security, access, lighting and VDI cabling for the building.

    • EcoStruxure Advisor Services for the management, through various software, of the inherent part of services and data analysis throughout the building's operational life.

    For the needs inherent to the missions of the Energy BU, the building will also be equipped with EcoStruxure Grid, the Schneider Electric offer dedicated to the energy market.

    The Workplace Efficiency space management solution will soon be implemented. It aims to reduce energy costs and make life easier for residents (room reservations, comfort management, etc.).

    Technopole is Smart Grid Ready, that is to say that the technical installations, associated with the EcoStruxure piloting system, can be made energy flexible by being able to shift their consumptions over time. For example, they will make it possible to optimize the energy bill by using dynamic pricing or optimizing the site's carbon contribution, or to sell this flexibility through demand / response operations, or to put it in place. available locally.


    Certification Scheme


    Location

    , 38000 GRENOBLE France

    Technicals Features