Sport'Co sports complex in Beaucouzé

  • Project type : New Construction
  • Building Type : Indoor gymnasium, sports hall, stadium
  • Construction Year : 2019
  • Delivery year : 2019
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 4 174 m2
  • Construction/refurbishment cost : 6 000 000 €
  • Number of Seat : 500 Seat


Moderated by : Hassan ABOUZID

Similar case studies

Gymnasium Castle Morange

Our architectural project stems directly from the program and our functional analysis. It revolves around the two main practices: sporting use and spectators. The readability of the organization in plan (simplicity and geometric rigor (...)

Gymnasium nitescent in Saint-Martin-en-Haut

First prize of Wood construction in 2012, the BBC label gymnasium of Saint-Martin-en-Haut offers a quality of use that improves significantly the city of tomorrow. The gymnasium of Saint-Martin-en-Haut is an impressive box 45m long (...)


  • Published on 13 May 19
    by Camille FAYET|France
    Viewed 676 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2019 - Buildings

    Health & Comfort
    Users' Choice


    Environment's respect
    Sobriety

    • Design based on the Négawatt scenario (sobriety, efficiency, renewable energies)
    • A building RT 2012 desired: a passive building proposed and soon positive energy
    • Heating at 12 ° C in sports halls
    • No hot water in the locker room sinks
    • Rainwater recovery for all Wcs
    • Establishment of a GTB to heat, illuminate and ventilate to just the necessary levels
    • Mechanical ventilation only when natural ventilation is not possible

    Efficiency

    • High performance envelope (27 cm LR)
    • High performance equipment:
    • Natural ventilation thanks to external air intake grilles controlled according to the indoor and outdoor temperatures (COLT system)
    • Double flow ventilation with an air sensor system for preheating the air in winter (Aérollagg system)
    • Intelligent ventilation control via a GTB with priority to natural ventilation
    • Natural light well SOLARSPOT
    • 3 air / water PACs that generate low temperature heating and DHW for changing rooms
    • Recovery of EP for sanitary
    • BEPOS level achieved with the rental of the roof for the installation of photovoltaic panels
    • Use of renewable energy: air, water and sun / light

    renewable

    • Preheating the fresh air of a DF unit with air solar collectors
    • Buildings designed for photovoltaic installations
    • Natural ventilation controlled

    Quality of life

    Winter thermal comfort:

    • Comfort temperature 12 ° C sports halls and 19 ° C elsewhere
    • Low temperature radiant ceilings
    • Double-flow ventilation (milk preheating by Aérollagg system)

    Thermal comfort between seasons and summer

    • Natural ventilation all-weather operation controlled via GTB (colt system)
    • Unloaded building discharge (colt system, free cooling)

    Visual comfort:

    • FLJ studies for all premises
    • Glazing polycarbonate glazing with anti-glare treatment
    • Sun protection minimizes direct radiation on all facades
    • Skylight in the locker room
    • Modulation of artificial lighting according to natural intake and practiced sport
    • Implementation of high quality LED luminaire to avoid glare

    Acoustic :

    • Integration of technical equipment in closed or protected premises
    • Technical premises adjacent to buffer rooms
    • Acoustic treatment in all spaces (walls, ceilings)

    Services :

    • Space of conviviality with a bar
    • Meeting room
    • Infirmary
    • Gym: party room

    Economic performance

    • High performance building for a zero energy bill (after photovoltaic installations)
    • Choice of local actors mainly for design and implementation

    Responsible management

    • Internal management at the MOE: CRR Architecture and CRR Engineering
    • Presentation of STD and FLJ calculations at MOA in APS and APD: decision support
    • Monitoring, performance management and maintenance via GTB

    Certification Scheme


    Location

    Site de la Haye , 49070 Beaucouzé France

    Technicals Features