Passive housing of the "Justice" Islet

  • Project type : New Construction
  • Building Type : Collective housing < 50m
  • Construction Year : 2017
  • Delivery year : 2018
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 2 031 m2
  • Construction/refurbishment cost : 2 800 000 €
  • Number of Dwelling : 30 Dwelling
  • Cost/m2 : 1 379 €/m2
  • Cost/Dwelling : 93 333 €/Dwelling


Moderated by : Hassan ABOUZID

Similar case studies

The First ECO-SANDWICH House

The First ECO-SANDWICH® House is a unique example of a holistic and innovative approach to sustainable architecture. The house is the first of twelve planned passive house energy standard multi-family houses in the green area of City (...)

Passivhaus via Napoleone Bonaparte in Putignano

​Project:A low-cost Passivhaus in southern Italy was chosen as a sample project to test a compact solution for heating, cooling, DHW and mechanical ventilation. An integrated design approach made possible a cost-effective building (...)

Accent Vert & Accent Eco

​The ACCENT VERT & ACCENT ECO project is located on the outskirts of Warsaw on a former agricultural land, in a neighbourhood that is today rapidly developing and will soon be just next to the new metro line.The buildings are located (...)


  • Published on 27 May 19
    by Benjamin Boyaval|France
    Viewed 902 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2019 - Buildings

    Energy & Temperate Climates
    Users' Choice


    PASSIVE housing, labeled PASSIVHAUS. Implementation of double flow, triple glazed frame, heat pump on gray water, external insulation, collective boiler for DHW.


    Certification Scheme


    Location

    41 rue de la justice , 59000 LILLE France

    Technicals Features