Niama

  • Project type : New Construction
  • Building Type : Collective housing < 50m
  • Construction Year : 2014
  • Delivery year : 2014
  • Climate zone : [Aw] Tropical Wet & Dry with dry winter.
  • Net Floor Area : 1 695 m2
  • Construction/refurbishment cost : 2 450 000 €
  • Number of Dwelling : 19 Dwelling
  • Cost/m2 : 1 445 €/m2
  • Cost/Dwelling : 128 947 €/Dwelling


Moderated by : Vincent Gilfaut

Similar case studies

7 low-energy ModCell homes

These 7 terraced homes located in Shirehamton, Bristol, UK, constitute the world’s first commercially available straw eco-homes, using the BM Trada Q Mark certified ModCell Core prefabricated straw bale panel system. As part of the (...)

The First ECO-SANDWICH House

The First ECO-SANDWICH® House is a unique example of a holistic and innovative approach to sustainable architecture. The house is the first of twelve planned passive house energy standard multi-family houses in the green area of City (...)

Evocasa Selecta

Mixed use development comprising 77 apartaments spread from 2nd floor to 10th floor, offices on 1st floor and commercial spaces on ground floor. Regime of height 2B+GF+10F.


  • Published on 07 July 16
    by François Garde|France
    Viewed 3061 times


  • Contest

    Green Building Solutions Awards 2016

    Energy & Hot Climates
    Users' Choice Award



    Location

    Ravine Blanche , 97410 Saint Pierre, La Réunion France

    Technicals Features