"Maison des charmilles" : rehabilitation of a stone house and metal heightening

Extension + refurbishment

  • Building Type : Isolated or semi-detached house
  • Construction Year : 1900
  • Delivery year : 2015
  • Address 1 - street : 29, rue des charmilles 33400 TALENCE, France
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.

  • Net Floor Area : 140 m2
  • Construction/refurbishment cost : 200 000 €
  • Number of Dwelling : 1 Dwelling
  • Cost/m2 : 1428.57 €/m2
  • Primary energy need
    48 kWhep/m2.an
    (Calculation method : RT existant )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

The house of the charmilles is a renovated stone house, with an entirely metallic heightening. The structure of the heightening is placed intramural on six micropiles, the stone facade is therefore free of any additional weight. Talence being a city built for the most part on very plastic clays, a heightening is only possible with a soil study, and a structure study for implantation. The heightening has therefore, structurally, been completely detached from the existing.

The outside part of the ground floor is rehabilitated in the old style : wood joinery and restaurated stone. A small town garden completes the set, with its steel bicycle shelter. The interior has an industrial style : black waxed concrete on the floor, the framework of the visible heightening. The floor of the second floor is visible in the living area.

The heightening is all metal: steel and aluminum. The aluminum joinery is inserted between cladding trays supporting the steel facade. The steel shutters protect these joinery.

The quality of the insulation is perfect: the insulation passing through the slab, 25cm plus 10cm on the upstairs frontage, the house goes to A for the energy diagnosis, which is very rare for old ones.

A little nod is made to Mondrian with the colors of the storage wall and the kitchen / staircase. The storage wall (with wardrobe, library, kitchen) hides full height doors separating the living area from the master suite and the pantry. The staircase is a central element of the house, it separates the spaces and releases the kitchen space which finds place below. The staircase is suspended from the upstairs hopper by its all-steel guardrail, the steps are folded, and the whole is powder-coated.

All steel and stone project!

 

Sustainable development approach of the project owner

The client wanted to go further than thermal regulations, and have as little loss as possible.

Architectural description

The house of the Charmilles was originally a freestone and brick house. The heritage character has been preserved by keeping and highlighting the freestone, and by reinstalling wood joinery, but of quality.

The heightening requested by the client, in addition to the issue of the basement, also had to be as efficient as possible thermally. The insulation, inside the ground floor, therefore runs on the floor which is in metal framework and suddenly in distributed insulation! No thermal bridge.

The insulation of the roof was made by sandwich panels of 120 mm (to avoid a dew point on the underside), and an addition of insulation while crawling.

The client wanted an industrial spirit, the choice of the heightening therefore fell on a steel structure, with metal cladding.

Building users opinion

Quote from the owner: "An old but contemporary house with its metal elevation in which it is very pleasant to live. "

If you had to do it again?

The question of phase shift! If it had to be done again, we would rather prescribe wood fiber or other interesting phase-shifting insulation, for summer comfort!

See more details about this project

 https://www.justinereverchonarchitecte.archi/page15.html

Photo credit

IOS photographies

Contractor

Construction Manager

Stakeholders

    Thermal consultancy agency

    LBM énergie

    Céline Lefevre-Thivet ‭06 82 16 30 48

    Thermal engineering office



    Other consultancy agency

    ALIOS

    Mme Abrachy ‭+33 6 12 05 26 56‬

     http://alios.fr

    Soil studies office

Contracting method

Separate batches

Type of market

Global performance contract

Energy consumption

  • 48,00 kWhep/m2.an
  • 150,00 kWhep/m2.an
  • RT existant

    Heating: 3291 Domestic hot water: 3372

  • 400,00 kWhep/m2.an

Real final energy consumption

    6 663,00 kWhef/m2.an

Systems

    • Condensing gas boiler
    • Condensing gas boiler
    • No cooling system
    • Humidity sensitive Air Handling Unit (Hygro B
    • No renewable energy systems

Urban environment

  • 110,00 m2
  • 70,00 %
  • 40,00
  • Urban context.

Product

    Micro-piles

    SOLTECHNIC

    SOLTECHNIC Mr Carmagnat

     http://www.soltechnic.com

    Micro-piles within the right-of-way, as close as possible to the existing.

    Validated by the client

Construction and exploitation costs

  • 30 000
  • 460 000
  • The costs are as follow:
    - purchase of the house: 230,000 euros
    - engineering: 30,000 euros
    - renovation: 200,000 euros

Energy bill

  • 624,00

GHG emissions

  • 11,00 KgCO2/m2/an

Reasons for participating in the competition(s)

​La maison des charmilles est la preuve qu'il est possible de rénover, et même d'agrandir une maison ancienne  avec les normes de la construction neuve actuelles !

La maison des charmilles a donc permis de valoriser un patrimoine en pierre, tout en offrant le confort nécessaire à ses usagers.

  • Rénovation pour un projet maintenant tout acier et pierre.
  • Qualité d'isolation : la maison passe en A au diagnostic énergétique ce qui est très rare pour de l'ancien, grâce notamment à un isolant passant en nez de dalle, filant du RDC ancien en ITE jusqu'au R+1 en isolation répartie.
  • Travaux rapides et budget maîtrisé grâce à la surélévation métallique qui est posée intra-muros sur six micropieux. La façade en pierre n'a donc pas à supporter de poids supplémentaire.
  •  Confort pour les habitants : la cuisine ouverte sur le salon et au milieu des chambres à l'étage permet de créer une pièce d'échange mais aussi de surveiller les enfants.

 

 

 

Building candidate in the category

Health & Comfort

Health & Comfort

Green Solutions Awards 2020-2021
PDF
 steel heightening stone renovation insulation micropiles clay industrial waxed concrete health and comfort

Share :
Author of the page

Justine REVERCHON

Présidente SAS, architecte DPLG


Other case studies

More

Contest

Green Solutions Awards 2020-2021