GREENTER

  • Project type : New Construction
  • Building Type : Other commercial buildings
  • Construction Year : 2012
  • Delivery year : 2012
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 1 100 m2
  • Construction/refurbishment cost : 850 000 €
  • Number of Visitor : 10 Visitor
  • Cost/m2 : 773 €/m2
  • Cost/Visitor : 85 000 €/Visitor


Moderated by : Charlotte Harrivelle

Similar case studies

southwest clinical center

Sustainability in commercial condominium    1-                                                                                  IntroductionImagined since the 18thcentury, Brasilia emerged as a demonstration of the capacity of Brazili (...)

Konseguela business Area, Mali

The Electrified Activity Zone (EAZ) is an innovative project developed by the Renewable Energy, Environment and Solidarities Group (GERES) to meet the energy needs of Very Small Enterprises (VSE) in rural Mali. In Konséguéla, this (...)

One Nation

One Nation is a shopping center "outlet" dedicated to ETDE luxury fashion brands. It is located in Clayes-Sous-Bois, west of Paris and near the Palace of Versailles (less than 10 km). The architect took into account the life cycle (...)


Testimonials


Comments


  • Published on 08 February 13
    by Nicolas DELBARRE-CAUX|France
    Viewed 5658 times
  • Proposed by :




  • Contest




    Certification Scheme


    Location

    56, rue des Ormes , 37530 Nazelles-Négron France

    Technicals Features