Eco Village 2 Jules Verne

  • Project type : New Construction
  • Building Type : Factories
  • Construction Year : 2014
  • Delivery year : 2014
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 3 420 m2
  • Construction/refurbishment cost : 2 300 000 €
  • Number of Installed Kw : 30 Installed Kw
  • Cost/m2 : 673 €/m2
  • Cost/Installed Kw : 76 667 €/Installed Kw


Moderated by : Sylvain Bosquet

Similar case studies

Star Innovation Center passive factory project

The Star Innovation Center is a product development facility located outside of Colombo in Katunayake, Sri Lanka. Intended to be a global model for the entire garment industry, the project sets a new high bar for sustainability, energ (...)

Indospace Industrial Park Vallam

Near major highways and easily accessible to Chennai, the IndoSpace Industrial Park Vallam is situated in an ideal location for the warehousing sector. The park consists of four buildings, one of which has received EDGE certification (...)

"Aerem " factory

Aerem's head office in Pujaudran (32) is a positive energy plant, delivered by the end of 2018. This company, organized in SCOP, offers solutions with a mechanical focus for the aerospace, space and pharmaceutical industries. In orde (...)


  • Published on 20 February 14
    by Olivier Kracht|France
    Viewed 5888 times


  • Contest




    Certification Scheme


    Location

    avenue du superbe orénoque , 80440 Boves France

    Technicals Features