Collective housing "the countryside in Paris"

  • Project type : New Construction
  • Building Type : Collective housing < 50m
  • Construction Year : 2016
  • Delivery year : 2016
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 649 m2
  • Construction/refurbishment cost : 1 300 000 €
  • Number of Dwelling : 11 Dwelling
  • Cost/m2 : 2 003 €/m2
  • Cost/Dwelling : 118 182 €/Dwelling


Moderated by : C21 France La redaction

Similar case studies

7 low-energy ModCell homes

These 7 terraced homes located in Shirehamton, Bristol, UK, constitute the world’s first commercially available straw eco-homes, using the BM Trada Q Mark certified ModCell Core prefabricated straw bale panel system. As part of the (...)

House on the Mountain

​The House on the Mountain was conceived as house for one family with three additional holiday apartments.It softly nestles against the slope and it’s size, roof shape and materials are inspired by the traditional „Wälderhaus“. The (...)

Flatmettoekomst - Utrecht (net zero-energy 'flat for the future')

Flatmettoekomst is a net zero energy retrofit of apartment buildings dated from the early sixties of last century. The project consist of 48 apartments. Currently an additional 80 apartments are retrofitted with the same concept.This (...)


  • Published on 06 June 18
    by Brigitte Philippon|France
    Viewed 4669 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Energy & Temperate Climates
    Users' Choice


    • Photovoltaic panels
    • Solar panels
    • Recovery of rainwater
    • MOB facade
    • BBC Cerqual Profile A

    Certification Scheme


    Location

    35, rue du Capitaine Marchal , 75020 PARIS France

    Technicals Features