B'EST

  • Project type : New Construction
  • Building Type : Other commercial buildings
  • Construction Year : 2018
  • Delivery year : 2018
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Net Floor Area : 55 000 m2
  • Construction/refurbishment cost : 60 000 000 €
  • Number of Visitor : 100 Visitor


Moderated by : La rédaction C21

Similar case studies

One Nation

One Nation is a shopping center "outlet" dedicated to ETDE luxury fashion brands. It is located in Clayes-Sous-Bois, west of Paris and near the Palace of Versailles (less than 10 km). The architect took into account the life cycle (...)

GREENTER

This building office and storage uses only wood structure 110m3. Its format is similar to a gymnasium, its thermal performance allows it to be Minergie labelled. With its simple skeleton, we can easily imagine transform it into an (...)

Crématorium Sud Loire

The Crematorium intercommunal project is located in the heart of the new industrial zone of Butay, located south-west of the commune of Château-Thébaud. The proximity of the motorway A83, the RN 249 and the departmental road 137 gives (...)


  • Published on 26 June 18
    by sophie droalin|France
    Viewed 683 times


  • Certification Scheme


    Location

    A4 sortie 41 échangeur de Farébersviller , 57450 Farébersviller France

    Technicals Features