Alphonse BAUDIN School Group - Bourg en Bresse

  • Project type : Extension + refurbishment
  • Building Type : School, college, university
  • Construction Year : 1950
  • Delivery year : 2016
  • Climate zone : [Cbc] Mild, dry winter, warm and wet summer.
  • Net Floor Area : 1 645 m2
  • Construction/refurbishment cost : 2 000 000 €
  • Number of Pupil : 120 Pupil


Moderated by : C21 France La redaction

Similar case studies

Waste House

​The Brighton Waste House is the first permanent ‘carbon negative’ public building in Europe to be constructed from approximately 90% waste, surplus material & discarded plastic gathered from the construction and other industries, (...)

RENOVATION OF THE SCHOOL GYM – MIDDLE SCHOOL “DANTE ALIGHIERI”

In the Mediterranean climate, through careful design based on sustainable bioclimatic study of the site, marked by the simple construction of the dry assembly, the project of renovation of an existing gymnasium obtains high performanc (...)

Kwel Kah Baung Migrant Learning Center

​​Kwel Ka Baung schooling project is supporting and educating around 450 migrant children in Karen Community of Mae Sot on the Thai-Burma border. The current school location became under scrutiny when the current land owner decided (...)


  • Published on 03 May 18
    by Philippe Herbulot|France
    Viewed 2015 times
  • Proposed by :




  • Contest

    Green Solutions Awards 2018 - Buildings

    Energy & Temperate Climates
    Users' Choice


    • Innovation in terms of financing: the project is supported by a delegated developer: a public company Locale SPL, a first in France.
    • Innovation in terms of involvement for craft companies to engage in a CREM, few operations in France involve craft companies in a performance guarantee contract
    • A collaborative approach: teamwork and a strong collaboration which made it possible to respect the deadlines of the building site, to make emerge the relevant solutions while controlling the costs and favoring the quality of the renovation.
    • A pragmatic and optimized approach in the architectural proposal of the team which made it possible to improve the comforts:

    - thermal (Improvement of the compactness of the building by the extension) - acoustic-visual (destruction of a wart building which allowed a better contribution in natural light of the premises, and to give a very beautiful perspective on the park for the whole occupants) - well-being: expansion of the course for children and creation of a semi open courtyard to enjoy the outdoor space at all times
    Other performances:

    • An energy performance labeled BBC renovation (- 40% / Cep ref) A contractual commitment, within the framework of a CREM, with a reduction in all-purpose consumption of - 60%. A group of local craft companies and established on the territory.
    • Rehabilitation, complex restructuring managed over 12 months a record in terms of project management
    • An approach of implication and sociological approach towards the users of the buildings
    • Winning operation with the call for projects "PREBAT Demonstration buildings with low energy consumption"

    Certification Scheme


    Location

    , 01000 Bourg en Bresse France

    Technicals Features