10-12 Rue d'Anjou
- by Nicolas Tennevet
- /
- 2015-06-19 16:53:39
- /
- France
- /
- 11418 / FR
Renovation
- Building Type : Office building < 28m
- Construction Year : 1890
- Delivery year : 2014
- Address 1 - street : 10-12 Rue d'Anjou 75008 PARIS, France
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 7 016 m2
- Construction/refurbishment cost : 13 500 000 €
- Cost/m2 : 1924.17 €/m2
-
Primary energy need :
68.44 kWhep/m2.an
(Calculation method : RT 2005 )
Haussmann type building for office use, located at 10/12 rue d'Anjou in the 8th arrondissement of Paris.
The construction of the building dates from the years 1880-1890. The current building is consiste of 6 storeys and 4 underground levels levels. In superstructure, the building develops 4 wings around a private central courtyard.
The works involves the renovation of office space, excluding fittings and furniture, and including the change of floor coverings and interior walls, suspended ceilings and the complete overhaul of technical equipment (heating, air conditioning, electricity ...).
Data reliability
3rd part certified
Stakeholders
Contractor
SNC PARANJOU c/o FONCIERE DE LUTECE ntennevet@macifimo.comAssistance to the Contracting Authority
CBRE ProjectAssistance to the Contracting Authority
EGIS CONSEIL In charge of the building environmental certificationsDesigner
SAHUC & KATCHOURAThermal consultancy agency
LAFIConstruction company
BOUYGUES BATIMENT ILE DE FRANCE - Rénovation PrivéeCertification company
CERTIVEA 01 40 50 29 09Contracting method
General Contractor
Owner approach of sustainability
The contractor wished to have this operation following an Environmental Quality approach. He decided to launch the project in a HQE certification approach for Tertiary Building Renovation in its version of 25 January 2013.
Architectural description
The construction involved the renovation of office spaces, without interior arrnagements and furniture, and including the change of floorings and interior walls, suspended ceilings and the complete overhaul of technical equipment (heating, air conditioning, electricity ...).
Building users opinion
To meet the goals of the environmental certification of the building and to follow the satisfaction of the inoccupants after they moved in, a commissioning mission will be undertaken.
Energy consumption
- 68 kWhep/m2.an
- 103 kWhep/m2.an
- 234 kWhep/m2.an
Envelope performance
- 1 W.m-2.K-1
- 2
Systems
- Urban network
- Fan coil
- Individual electric boiler
- Urban network
- Fan coil
- Double flow heat exchanger
- No renewable energy systems
Smart Building
Product
-
Double low emissivity glazing argon gas

Finishing work / Exterior joinery - Doors and Windows
Double glazing with argon gas Warm edge 4/16/4 Ug = 1.1 TL = 80% for a good resource for natural lighting and thus reduce lighting consumption FS = 0.63
Product meeting the environmental requirements of the operation
-
Air handler

HVAC, électricité / ventilation, cooling
CTA turbofan with highly efficient heat recovery system (efficiency greater than 80%)
Product meeting the environmental requirements of the operation
Compte tenu des défis énergétiques à relever dans l’existant, notre opération de rénovation environnementale d’un immeuble haussmannien nous semblait être un exemple concret et reproductible des solutions qui peuvent être mise en place pour répondre à cet enjeu.
Cette opération se veut exemplaire sur les sujets environnementaux et a obtenu une triple certification environnementale :
- HQE -Niveau EXCELLENT
- BREEAM -Niveau VERY GOOD
- LEED -Niveau SILVER
Author of the page
Other case studies

Oficinas Santa Catarina ( FINSA offices )
- 28/06/2019
- /
- EDGE Buildings
- /
- 14156

Indospace Industrial Park Vallam
- 28/06/2019
- /
- EDGE Buildings
- /
- 2795

Konseguela business Area, Mali
- 27/06/2019
- /
- Mathieu Hardy
- /
- 5654

Glorieta Insurgentes Tower
- 18/06/2019
- /
- Yoram Cimet
- /
- 4391

PopUp dorms
- 17/06/2019
- /
- Markus Lang
- /
- 4464

Perlita Passive house
- 17/06/2019
- /
- Xavier Gaucher
- /
- 2251