Aulario IndUVA

  • Project type : New Construction
  • Building Type : School, college, university
  • Construction Year : 2017
  • Delivery year : 2018
  • Climate zone : [Csb] Coastal Mediterranean - Mild with cool, dry summer.
  • Net Floor Area : 5 539 m2
  • Construction/refurbishment cost : 5 700 000 €
  • Number of Pupil : 2 523 Pupil


Moderated by : Vincent Gilfaut

Similar case studies

Waste House

​The Brighton Waste House is the first permanent ‘carbon negative’ public building in Europe to be constructed from approximately 90% waste, surplus material & discarded plastic gathered from the construction and other industries, (...)

RENOVATION OF THE SCHOOL GYM – MIDDLE SCHOOL “DANTE ALIGHIERI”

In the Mediterranean climate, through careful design based on sustainable bioclimatic study of the site, marked by the simple construction of the dry assembly, the project of renovation of an existing gymnasium obtains high performanc (...)

Kwel Kah Baung Migrant Learning Center

​​Kwel Ka Baung schooling project is supporting and educating around 450 migrant children in Karen Community of Mae Sot on the Thai-Burma border. The current school location became under scrutiny when the current land owner decided (...)


  • Published on 20 March 18
    by María Jesús González Díaz|España
    Viewed 4067 times


  • Contest

    Green Solutions Awards 2018 - Buildings

    Energy & Temperate Climates
    Users' Choice
    Sustainable Construction Grand Prize



    Certification Scheme


    Location

    Paseo del Cauce, 50A , 47011 VALLADOLID España

    Technicals Features