My Republic Plaza (Green Office Park 6)

New Construction

  • Building Type : Office building < 28m
  • Construction Year : 2014
  • Delivery year : 2015
  • Address 1 - street : Jl. Grand Boulevard, BSD Green Office Park, BSD City 15345 TANGERANG, Indonesia
  • Climate zone : [Af] Tropical Wet. No dry season.

  • Net Floor Area : 15 832 m2
  • Construction/refurbishment cost : 14 673 193 €
  • Cost/m2 : 926.81 €/m2

Certifications :

  • Primary energy need :
    140 kWhpe/m2.year
    (Calculation method : )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building
​My Republic Plaza (Green Office Park6) is located in foot print area amounted 12,890 m2 has five floors for work space and basement. It also becomes one of part in Green Office Park BSD City which built base on Green Building Concept as one of Sinar Mas Land efforts to brings the environmental protection commitment into reality. It has proven as Green Building with honor "Gold" by GBC Indonesia (Green Building Council Indonesia)

See more details about this project

 http://www.sinarmasland.com/site/discover-properties/commercial-industrial/bsd-green-office-park

Data reliability

3rd part certified

Stakeholders

    Construction company

    PT. Total Bangun Persada Tbk

Contracting method

Other methods

Owner approach of sustainability

BSD Green Office Park was recognized for incorporating advanced green architectures to conserve energy, water and natural resources. All its buildings maximize sunlight penetration while reducing solar heat, thus boosting energy efficiency, and optimizing air circulation.

Architectural description

GOP 6 Building Orientation is located 22.5˚ to west/ east and active work room face to north or south, (two wings). The design was made to help reduce solar heat and thus energy consumption. West-facing elevation should be minimize and if necessary, adequate sun-shading is to be provided at these elevation The floor elevation has five floor It aims to supply enough sunshine which is through into active work room

If you had to do it again?

all system are going well as planed. further more it increases efficiency in operational building cost.

Building users opinion

building more healthy and comfort, increase productivity for occupant

Energy consumption

  • 140,00 kWhpe/m2.year
  • 250,00 kWhpe/m2.year
  • 117,00 kWhfe/m2.year

Envelope performance

    Wall of façade GOP 6 has an area about 5.624 m2. It had been designed and made from some layers of material for solid layer such as concrete, light brick ACP (aluminum composite panel) and gypsum for inside layers The glass uses 8mm T-Sunlux T-CS 140 #2 + 12mm AS + 6mm Panasap Dark Blue (Bluish Grey). Panasap Dark Blue (Bluish Grey). The Panasap glass can absorb radiation of sun which enters the building about 55% (U-Value Total Solid is 1.89 Watt/m2.K). and (U-Value Total Solid and include glazing/transparant is 2.96 Watt/m2.K)
    (OTTV) is about 28.9 W/m2 and Roof (RTTV) is about 29.7 W/ m2. The value is better than National Standard by SNI 03-6389-2000 it is 35 W/m2

  • 2,40

Real final energy consumption

    117,00

    2 016

Systems

    • No heating system
    • Other hot water system
    • Fan coil
    • VAV Syst. (Variable Air Volume system)
    • Natural ventilation
    • Solar photovoltaic

    using central water cooled system

Smart Building

    Monitoring AC, energy consumption, CO2 Sensor, water and others

    NA

    can monitor energy consumption building up to date

GHG emissions

  • 103,00 KgCO2/m2/year
  • IPCC

  • 25,00 year(s)

Life Cycle Analysis

  • 62,00
  • 5%

Water management

  • 7 800,00 m3
  • 2 335,00 m3
  • 313,00 m3
  • Use of non-potable water for cooling tower and other purposes it use recycles water and storm. The total of water needs is 62 m3 which supplied by 62% recycle water and 38% clean water.
    Rainwater harvesting & percentage in reduction of potable water consumption: the water needs which can supply by the storm are 47m3. It is based on assumption that rainfall is 50 mm/day with the percentage of storm 53% in a year.
    Water treatment / recycling capacity
    The water needs which can supply by recycling water is 25.6 m3. It used to supply WC flushing, irrigation, and makeup
    Flush garden sprinkler system
    Other Specifications

    water cooling tower.
    The total of water need is (urinal, WC, faucet, shower, irrigation, and make up the cooling tower) 65781 L/day. The water source of recycling water and storm can supply 14939 m3 and it is replaced

Indoor Air quality

    8707 L/s

Health & Comfort

    Area of natural lighting in buildings GOP 6 include: Toilet Area, Working Space Area, and the Lobby Area. Zoning for Integrated lighting and Day Lighting
    For Working Space Area Natural lighting percentage was 34%

    Calculation ASHRAE : 8.707 L/s = 18.450 CFM Design 15.500 x 2 wing = 31.000 cfm (cubic feet minute)Fresh air needs is 15,832 CFM. It calculate based on air need per person set by ASHRAE62.1-2007, it is 5.5 l/person or 11 CFM/Person but it already provided

    2.Number of Ventilation air per person (CFM/person) Fresh air needs measurement show the result is 15.832 CFM. It was calculated based on air needs per person based on ASHRAE62. 1-2007, it is 5.5 l/person or 11 CFM/person. But the building completed with

    The room temperature has been measured and the result show between 24-250C with humidity between 60.8%-66.8%. It is included into a comfort zone that measured by the psychometric chart

    Thermal comfort – design indoor temp and relative humidityThe room temperature has been measured and the result show between 24-250C with humidity between 60.8%-66.8%. It is included into a comfort zone that measured by the psychometric chart

Product

    ACP (aluminum composite panel)

    ACPINDO

    Bpk. Roganda Hp / WA : 081294466666 email : marketing@acpindo.com

    Gros œuvre / Structure, maçonnerie, façade

    light brick ACP (aluminum composite panel) and gypsum for inside layers The glass uses 8mm T-Sunlux T-CS 140 #2 + 12mm AS + 6mm Panasap Dark Blue (Bluish Grey). Panasap Dark Blue (Bluish Grey).

    less man power install to building


    Glass

    Asahimas

    Yudi +62896 8530 6999

    Gros œuvre / Structure, maçonnerie, façade

    glass uses 8mm T-Sunlux T-CS 140 #2 + 12mm AS + 6mm Panasap Dark Blue (Bluish Grey). Panasap Dark Blue (Bluish Grey).

    so much choice for glass

Construction and exploitation costs

  • 14 673 193

Energy bill

  • 16 900,00

Urban environment

This building in Green office park area, that have many public facility : supermarket, lake, garden, restaurant and pedestrian to approach people walking to public facility

Land plot area

13 000,00 m2

Built-up area

60,00 %

Green space

7 064,00

Parking spaces

247 CAR USER, POSITION IN BASEMENT 1 WITH CONCRETE SURFACE

Building Environmental Quality

  • indoor air quality and health
  • comfort (visual, olfactive, thermal)
  • energy efficiency
  • integration in the land

Contest categories

Energy & Hot Climates

Energy & Hot Climates

Low Carbon

Low Carbon

Green Solutions Awards 2017 - Buildings