Head Office Attijariwafa Bank

New Construction

  • Building Type : Office building < 28m
  • Construction Year : 2016
  • Delivery year : 2017
  • Address 1 - street : 163, Avenue Mohamed VI SOUISSI RABAT. 10170 RABAT, Maroc
  • Climate zone : [Csa] Interior Mediterranean - Mild with dry, hot summer.

  • Net Floor Area : 2 550 m2

Certifications :

  • Primary energy need :
    283 kWhep/m2.an
    (Calculation method : RTCM )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

The project is the design of the new headquarters of ATTIJARI WAFA BANK, it is a building for office use which consists of a Ground floor (RDC) with a floor and a basement. The ground floor and the staircase consist of offices and meeting rooms, and the basement is a parking lot linked to the building.

The building has four façades, two of which are terraced with villas and one with a restaurant and the fourth overlooks Avenue Mohamed VI

Data reliability

3rd part certified

Stakeholders

    Contractor

    Groupe Attijariwafa Bank

    06 69 82 52 86

    Head of Development & Project Management LAG

Contracting method

Other methods

Energy consumption

  • 283,00 kWhep/m2.an
  • 433,00 kWhep/m2.an
  • RTCM

  • 113,00 kWhef/m2.an
  • Heating: 47711.40 Kwh / year cooling: 66671.11 Kwh / year Lighting: 123487.61 Kwh / year Ventilation: 18826.28 Kwh / year Equipment: 158981.57 Kwh / year

Envelope performance

  • 0,93 W.m-2.K-1
  • EN 13829 - n50 » (en 1/h-1)

  • 1,00
  • External wall composition: • Mortar (dry weight 1300): 1.5 cm • Red brick 6 holes: 7 cm • Unvented air blade: 13 cm • Red brick 6 holes: 7 cm • Mortar (Density 1300) : 1.5 cm

Real final energy consumption

    113,00

Systems

    • VAV System
    • No domestic hot water system
    • VRV Syst. (Variable refrigerant Volume)
    • Double flow
    • No renewable energy systems
  • RENEWABLE ENERGY Not included in project

Smart Building

    Presence detectors, Security lighting, Lifts,

GHG emissions

  • 107,00 KgCO2 /m2
  • 50,00 an(s)
  • Dynamic thermal simulation

    Dynamic thermal simulation, HQE repository

Water management

  • 1 061,00 m3
  • The building is powered by the ONEEP network calculation method: target tool 5

Indoor Air quality

    Air quality at the project site is good: The project is far from the industrial environment, fuel-based energy production, and fleets, especially for buses and taxis.

Health & Comfort

    Été : 24°c , Hiver: 22°c

    All the requirements of comfort (hygrothermal, visual, olfactory, acoustic) and health (air, water and space quality)

    The project is far from the sources of noise nuisance

Product

    Marble type BOTTICINO

    Second œuvre / Peinture, revêtements muraux


    CARREAUX DE GRES CERAME MARAZZI BLOCK GREIGE RETT THE 60 X 60CM CODE GR2

    Second œuvre / Revêtements de sol 

Urban environment

Public transport: The site is served by 3 bus lines, Grands and Petits Taxis Espace Verts: The Borough SOUISSI has several green areas

Land plot area

3 834,00 m2

Built-up area

2 250,00 %

Green space

58,00

Parking spaces

The Parking located in the basement,

Building Environmental Quality

  • Building flexibility
  • indoor air quality and health
  • comfort (visual, olfactive, thermal)
  • mobility
  • products and materials

Contest categories

Bas Carbone

Bas Carbone

Santé & Confort

Santé & Confort

Coup de Cœur des Internautes

Coup de Cœur des Internautes

Green Solutions Awards 2017 - Bâtiments