The "Marais Girard" farmhouse

  • Tipo de proyecto : Ampliación + Renovación
  • Tipo de edificio : Hotel, pensión
  • Año de la construcción : 2013
  • Años de entrega : 2014
  • Zona climática : [Cfb] Marine Mild Winter, warm summer, no dry season.
  • Superficie útil : 1 300 m2
  • Coste de la construcción : 2 600 000 €
  • Número de unidades funcionales : 15 Habitaciones
  • Coste/m2 : 2 000 €/m2
  • Coste/Habitaciones : 173 333 €/Habitaciones


Moderado por : Sylvain Bosquet

Estudios de caso similares

TERRA BIOHOTEL

Terra Biohotel it's a hotel being built in the midwestern area, district Conquistadores, Medellin city-Colombia. It's a proyect of contemporary design that ensures the protection of the environment, the socioeconomic development witho (...)

Reforma y ampliación de un hotel en Cantabria

Se trata de la completa reforma de un hotel de los '80 duplicando su superficie con la adición de un SPA y un restaurante. El edificio original era de estructura de hormigón y toda la ampliación se plantea con madera, incluyendo fach (...)

Casa del Castell: Efficient Hotel

​La Casa del Castell es el primer hotel diseñado y construido según el estándar Passivhaus en Cataluña, actualmente en proceso de certificación. El hotel ofrece cuatro habitaciones en una zona rica en historia, con grandes viñedos (...)


  • Publicado 25 junio 15
    por marie PERIN|France
    Visto 8939 veces


  • Concurso

    Green Building Solutions Awards 2015

    Matériaux bio-sourcés et recyclés


    The purpose of this construction was to make maximum use of bio-based and site materials such as materials coming from the deconstruction. Thus, an original and efficient reuse despite the difficulties of standards and regulations related to public buildings and construction in general.

    • All insulators are natural and all timber and finishing wood are certified.
    • Internal linings in old renovated building of the farm are lime / hemp.
    • The wood coming from the deconstruction of a barn have been reused in partition walls and in rooms and public areas decoration. The rafters were cut and used as external coating for the reception shaping a patchword.
    • Old tiles were re-used in walls to build a natural dryer for hotel laundry services.

    This realization came about through a convinced project management, committed companies and a determined team of architects to follow their common objectives of this exemplary project.


    Sistema/s de certificación


    Localización

    Le Marais Girard , 85470 Bretignolles sur mer France

    CARACTERÍSTICAS TECNICAS