New Construction
- Building Type : Office building < 28m
- Construction Year : 2014
- Delivery year : 2014
- Address 1 - street : 59000 LILLE, France
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 2 587 m2
- Construction/refurbishment cost : 2 600 000 €
- Cost/m2 : 1005.03 €/m2
-
Primary energy need :
53 kWhep/m2.an
(Calculation method : RT 2005 )
URBAWOOD is an innovative project of commercial building 100% wood, "oriented" sustainable development, born from the combination of 3 companies: Gerim, Nacarat Wood Construction and Design.
This concept was realized for the first time on THE urbawood located in Lille. In short:
- Surfaces: 2500 sq.m. / 2,250 m² Useful Surface (5 levels)
- Capacity: 299 people
- Level Energy Performance BBC (Low Consumption Building)
- Location: Quai Hegel - ZAC Euratechnologies - Lomme (59)
https://www.youtube.com/watch?v=KO1Y0GH9-Pg
Sustainable development approach of the project owner
Nacarat develops a committed sustainable development approach, based on an exeplary and certified ecodesign tool.Here, URBAWOOD is a turn key solution made out out of wood to the creation of tertiary spaces. This efficient concept of modular building makes possible the construction of RT2012 office buildings within weeks. The surfaces keep all the promises made in terms of construction reliability, deadlines ...
The first 4 level building (representing 2,600 m²) was built in less than 6 weeks!
Architectural description
Developed by Nacarat and designed with the architecture firm Agence A, this new 2,600m² large building was built with an industrial 100% wood process (European and PEFC certified), for the production of the two facades, floors, the partitions and the elevator shaft. From the foundations on March 12, 2012 to the end of the envelope on June 10th, it took only three months for regional construction companies Gérim and Création Bois to achive the construction.The well-being of future occupants is also one of the ambitions of the project, because beyond the warmth and natural look provided by wood, they will benefit from a high level of thermal and visual comfort, enhanced by integration of sunscreens on exposed facades.
Building users opinion
"The Urbawood building was built in record time, with an innovative process. We have installed on the first three levels, our ADICODE® spaces (innovation and co-design workshops). Installing innovative spaces in an innovative building, what a coincidence and a symbol for us to use in promotion!"
The completion of construction was done in excellent collaboration - and in a very united way - with teams from Nacarat, who were able to meet our deadlines and our ... "quirks"!
It is a building where it feels good to be, wooden construction gives a real cozy dimension. Several months after we moved in, the scent of the wood still exhales into the stairwell, it reminds itself to us with each pass, it's a nice touch for the "inhabitants" of the "house." "
Céline Dubois-Duplan, Marketing Manager / Corporate Relations Group HEI ISA ISEN, pilot ADICODE®
If you had to do it again?
Other Urbawood concept projects are currently in design in 2015. Other 100% wood projects or with wood facade / concrete core are under construction, while others have already been delivered.
See more details about this project
http://www.urbawood.fr/Stakeholders
Others
Diagobat
Bertrand André
http://www.diagobat.fr/Company
Creation bois construction
http://www.creationbois.fr/Others
Gerim
Rodrigue Lescaillet
http://www.gerim.com/frOthers
Effigenie
Camille Thiriez
https://www.effigenie.com/Designer
cabinet d'architectes Agence A
Contracting method
Off-plan
Systems
- Condensing gas boiler
- Water radiator
- No domestic hot water system
- No cooling system
- Nocturnal Over ventilation
- Double flow heat exchanger
- No renewable energy systems
Smart Building
Urban environment
- 1 200,00 m2
- 60,00 %
- 40,00
Product
Effipilote

Effigénie
Camille Thiriez
https://www.effigenie.com/Management / Facility management
Control and optimization of the Building Management System
The system seems to pose no concern.
Water management
Indoor Air quality
Comfort
GHG emissions
Life Cycle Analysis
Reasons for participating in the competition(s)
Biiobased materials : 100% woodSmart Buildings : Adopted solution is Effipilote, a pioneer for building management systemsHealth & Comfort : 100% wood inside and outside; awarded with AMO 2014 for the quality of work, the specific indoor air quality analysis (wood building) by the Ecole des Mines de Douai.Thirrd Industrial Revolution:
- Energy efficiency
- Circular economy
- Smart Grids
Author of the page
Other case studies



Vortex (Switzerland)
- 11/01/2023
- /
- Yasmina Sandoz
- /
- 537

The School of the "Chat Perché" (France)
- 10/01/2023
- /
- Florence Devernay
- /
- 1008

Revitalization of the Bourg Center
- 06/12/2022
- /
- Emmanuel d'Envirobat Centre
- /
- 486

Former Lapaire School of Sancoins
- 06/12/2022
- /
- Emmanuel d'Envirobat Centre
- /
- 511