"Murs à pêches" Pool
New Construction
- Building Type : Swimming pool
- Construction Year : 2017
- Delivery year : 2017
- Address 1 - street : rue Maurice Bouchor 93100 MONTREUIL, France
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 3 800 m2
- Construction/refurbishment cost : 16 500 000 €
- Number of Shower/day : 1 125 Shower/day
- Cost/m2 : 4342.11 €/m2
-
Primary energy need
2548 kWhep/m2.an
(Calculation method : Other )
Construction of a swimming pool including:
- a fun pool and learning center 400 m2,
- a small play area 40 m2
- a river running 212 m2
- play area for toddlers 75 m2
- a large wellness area with pool 154 m2, steam room, sauna, spa
- a restaurant
- an outdoor natural bath 1,265 m2
- an outdoor slide
- an outdoor pentagliss 110 m2.
Sustainable development approach of the project owner
The city of Montreuil wanted the construction of an exemplary pool in terms of respect for the environment and sustainable development. This future equipment dedicated to "educational and leisure aquatic activities" is complementary to the Maurice Thorez water sports stadium which offers exclusively sports activities. The client is involved in a HQE approach with the following main objectives: 1- harmonious relationship with his environment 2- optimization of energy resources 3- optimizing the use of water. CONCERN TO CREATE AN EXEMPLARY BUILDING IN TERM OF USE OF RENEWABLE ENERGY AND MATERIALS WITH LOW CARBON FOOTPRINT, ENERGY SAVING AND WATER TREATMENT ...
Architectural description
Project organized several buildings integrating the various functions and activities of the occupants (reception, cloakrooms, pools halls, outdoor spaces). Each volume revolves around circulations and access to these entities. The implementation of these volumes allows to benefit: sunshine and optimum lighting, open perspectives on the landscape, the outdoor pool and the proposed activities. Architecture offers a continuity between the inside and the outside. The choice of building materials such as wood, and green roofs will have an impact on the building performance as well as on the environmental aspects and the thermal and acoustic comfort of the uses.
Building users opinion
Very good level of lighting, very good acoustic quality, excellent thermal comfort. Quality of bathing water (no chlorine).
If you had to do it again?
Wind turbines. They have been deleted because they are not profitable enough on this project.
See more details about this project
http://www.coste.fr/projet.html?projet=ec161Contractor
Construction Manager
Stakeholders
Designer
Coste Architectures
Emmanuel Coste, architecte gérant
http://www.coste.frArchitecture
Type of market
Global performance contract
Energy consumption
- 2 548,00 kWhep/m2.an
- 3 900,00 kWhep/m2.an
Real final energy consumption
1 667,00 kWhef/m2.an
Envelope performance
- 1,40 W.m-2.K-1
Systems
- Heat pump
- Low temperature floor heating
- Wood boiler
- Solar Thermal
- Wood boiler
- No cooling system
- Natural ventilation
- Free-cooling
- Double flow heat exchanger
- Solar photovoltaic
- Solar Thermal
- Wood boiler
- Heat pump
- 79,00 %
Urban environment
- 17 000,00 m2
- 22,00 %
- 6 300,00
Product
Natural bathing

Procédé Aquatic Sciences
Jean-Christophe Gérard / Directeur Commercial France
http://www.aquatic-science.com
Biological filtration system for public bathing
Well accepted by users and maintenance team
Construction and exploitation costs
- 2 500,00 €
- 16 500 000 €
GHG emissions
- 40,00 année(s)
Life Cycle Analysis
Reasons for participating in the competition(s)
1st aquatic center with spaces in passive construction (energy neutral), construction in wood frame labeled PEFC, centralized technical management, reinforced insulation, recyclable materials, heat pump, wood boiler, solar thermal collectors, green roof, hydrolise salt, comfort ventilation, high effi ciency heat recovery, a low-nuisance ...
Natural outdoor swimming without chlorine.
Total primary energy = 79% renewable energy.
Building candidate in the category

Energie & Climats Tempérés

Coup de Cœur des Internautes
