Condominium Lamartine / Stalingrad
Renovation
- Building Type : Collective housing < 50m
- Construction Year : 1974
- Delivery year : 2018
- Address 1 - street : 93310 PRE-SAINT-GERVAIS, France
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 2 145 m2
- Construction/refurbishment cost : 553 000 €
- Number of Dwelling : 33 Dwelling
- Cost/m2 : 257.81 €/m2
-
Primary energy need
101 kWhep/m2.an
(Calculation method : RT existant )
The condominium, located in Pré-Saint-Gervais, has embarked on a renovation of its heritage in 2015-2016 by conducting an energy and architectural audit.
This global audit, carried out by the companies, PAZIAUD, Project Manager, and ENERGIEPULSE, specialist in financing, highlighted the potential of energy rehabilitation of buildings and their architectural revalorization, while respecting the financial capacities of the co-owners.
The co-ownership continues with the grouping in the design phase which develops an ambitious project of thermal improvement of the building: the technical choices were directed towards the strong reduction of the needs for heating by a complete heat treatment of the envelope of the buildings (facades, joinery , roofing, floors) before considering an improvement of the source of energy production by the installation of a gas condensing boiler. The quality of indoor air has not been forgotten with the implementation of moisture-sensitive mechanical ventilation in the homes.
The energy renovation allows to reach a level of performance "Building Low Consumption" with an energetic gain of more than 50%.
The renovation process was carried out thanks to a strong involvement of the co-ownership, in particular the union council, which carried this project for years. Numerous work meetings and educational presentations made it possible to obtain the co-owners' adhesion, in particular for the collective replacement of all joineries, ie an average share of € 17,000 including tax.
The situation of the co-ownership and the project allow it to be part of collective incentives incentive schemes: Sustainable Copro (IDF Region) and Living Better Joint Ownership (ANAH). The works were voted by the co-owners in November 2017 and were completed in December 2018.
Sustainable development approach of the project owner
The objective of the Project Management is to maintain its existing heritage and improve the comfort of occupants while reducing energy consumption. The initial constraints of heritage maintenance (renovation of facades, waterproofing of roofs) gradually evolved into an energy renovation project with a technical, architectural and financial approach.
The technical choices were directed towards the sharp reduction of the heating needs by a complete heat treatment of the building envelope (facades, joinery, roofing, floors) before considering an improvement of the source of energy production by the installation of a gas condensing boiler. The quality of indoor air has not been forgotten with the implementation of moisture-sensitive mechanical ventilation in the homes.
Architectural description
The residence includes 2 adjoining buildings built in 1974 for use as a collective dwelling:
- Stalingrad building: 29-31 Stalingrad street: 1 street access, 1 stairwell, 7 levels, 25 apartments
- Lamartine building: 2 rue Lamartine, 1 street access, 1 stairwell, 2 levels, 8 apartments.
The residence is built in Pré-Saint-Gervais in a very heterogeneous environment composed of suburban areas, small collectives and larger complexes. The renovation works with thermal insulation from the outside allow a sober architectural revaluation, by the choice of a set of shades with two colors: light gray and white with several reminders at the singular points of the facades (railings, bibs in light gray, louvers in white).
See more details about this project


Contractor
Construction Manager
Stakeholders
Assistance to the Contracting Authority
ENERGIE PULSE
Fatima-Zohra MEKREBI - merkrebi (at) energie-pulse.fr
http://www.energie-pulse.fr/Financial engineering
Company
Primiso (Lot 1 : mandadataire groupement Primiso-Metin-AEF)
Amor ZROUGA
Façades / Second Work / Locksmithing / Ventilation
Company
Metin (Lot 1 : membre groupement Primiso-Metin-AEF)
Ozcan YILDIRIM
roofing
Company
AEF (Lot 1 : membre groupement Primiso-Metin-AEF)
Dominique MONIN
https://www.aef-fenetres.com/Carpentry
Company
Controlfix (Lot 2)
Philippe BOURDIN
http://www.controlfix.net/Heating
Assistance to the Contracting Authority
Syndic : ATM & GAILLARD
Thierry MESGUICH
http://www.atmgaillard.com/Type of market
Global performance contract
Energy consumption
- 101,00 kWhep/m2.an
- 170,00 kWhep/m2.an
- 229,00 kWhep/m2.an
Systems
- Condensing gas boiler
- Condensing gas boiler
- No cooling system
- humidity sensitive Air Handling Unit (hygro A
- No renewable energy systems
Urban environment
Product
HYGROVENT

VTI
Patrick FRAISSE - patrickfraisse (at) vti-france.com
http://www.vti.frGénie climatique, électricité / Ventilation, rafraîchissement
Hybrid natural ventilation
Product suitable for improving ventilation in an existing building
Indoor Air quality
GHG emissions
- 21,00 KgCO2/m2/an
Reasons for participating in the competition(s)
The co-ownership Lamartine / Stalingrad is committed to a package of works gathering no less than six different energy improvement actions!
The technical choices were directed towards the sharp reduction of the heating needs by a complete thermal treatment of the building envelope (facades, joinery, roofing, floor) before considering an improvement of the source of energy production by the installation of a gas condensing boiler. The quality of indoor air has not been forgotten with the implementation of moisture-sensitive mechanical ventilation in the homes.
The energy renovation allows to reach a level of performance "Building Low Consumption" with an energetic gain of more than 50%.
The ambitious renovation process could only be done with a strong involvement of the co-ownership, in particular of the union council which carried this project during many years. Numerous work meetings and educational presentations made it possible to obtain the co-owners' adhesion, in particular the collective replacement of all joinery.
The aid provided by the public authorities was decisive with a collective aid rate of 50% of the budget of the operation.
Building candidate in the category

Energie & Climats Tempérés

Prix du public