Rchlo Ipanema CT - Filial 269
- by Anderson Calvo da Silva
- /
- 2019-06-14 04:06:16
- /
- International
- /
- 3311 / EN
Renovation
- Building Type : Downtown store
- Construction Year : 2015
- Delivery year : 2015
- Address 1 - street : 22410001 RIO DE JANEIRO, Brazil
- Climate zone : [Aw] Tropical Wet & Dry with dry winter.
- Net Floor Area : 1 304 m2
- Construction/refurbishment cost : 4 422 483 €
- Cost/m2 : 3391.47 €/m2
-
Primary energy need :
369.8 kWhpe/m2.year
(Calculation method : )
The store is the first LEED (Leadership in Energy and Environmental Design) certification process awarded by the U.S. Green Building Council (USGBC). Among the main sustainable initiatives are the installation of a rainwater reuse system, green roof deployment and the use of LED lighting.
See more details about this project
http://vogue.globo.com/moda/moda-news/noticia/2015/12/riachuelo-inaugura-sua-primeira-loja-verde-em-ipanema-no-rio-de-janeiro.htmlhttp://www.blogdafal.com.br/2016/01/18/riachuelo-ipanema/
Photo credit
Studio Demian Golovaty
Contractor
Construction Manager
Stakeholders
Construction Manager
NOROESTE CONSTRUÇOES E EMPREENDIMENTO LTDA
RENATO BARTOLOMEI
https://www.ncel.com.brCONSTRUTORA E INSTALADORA
Certification company
SUSTENTECH
Patrick Murisset
https://www.sustentech.com.brConsulting and certification manager LEED
Contracting method
General Contractor
Type of market
Table 'c21_maroc.rex_market_type' doesn't exist
If you had to do it again?
Innovative and motivating experience.
Building users opinion
A new experience where one can share the technology associated with the well-being of people without losing sight of the environment.
Energy consumption
- 369,80 kWhpe/m2.year
- 497,51 kWhpe/m2.year
- 6 500,00 kWhpe/m2.year
Envelope performance
- 1,61 W.m-2.K-1
- 0,15
- 10,00
Real final energy consumption
256,81 kWhfe/m2.year
Systems
- No heating system
- No domestic hot water system
- Water chiller
- Fan coil
- VRV Syst. (Variable refrigerant Volume)
- Free-cooling
- compensated Air Handling Unit
- No renewable energy systems
Smart Building
Urban environment
- 382,00 m2
- 100,00 %
- 123,00
Product
Lojas Riachuelo Conceito - certificação leed serie Gold

FAL DESIGN E PROJETOS
CLAUDIA BEIRÃO CARDOSO
http://www.blogdafal.com.brGros œuvre / Structure, maçonnerie, façade
rainwater system
100% led lighting system
lighting and air conditioning system controlled by automation
indoor / vertical landscaping.
Innovative, model and of great satisfaction.
The space, considered the first 'green store' of the network in Brazil, has several sustainable initiatives, among them the installation of a rainwater reuse system, the implementation of a green roof and LED lighting.
Life Cycle Analysis
Water management
- 10,00 m3
- 7,00 m3
- 20,00 m3
Indoor Air quality
Comfort
Reasons for participating in the competition(s)
The store is the first LEED (Leadership in Energy and Environmental Design) certification process awarded by the U.S. Green Building Council (USGBC). Among the main sustainable initiatives are the installation of a rainwater reuse system, green roof deployment and the use of LED lighting.Building candidate in the category

Energy & Hot Climates

Users' Choice
Author of the page
Other case studies

Holiday homes Marrakech Medina - AWB
- 25/03/2021
- /
- Ibtissam GHAZZAR
- /
- 5360

SEMI OLYMPIC SWIMMING POOL COVERED IN SIDI YOUSSEF BEN ALI
- 25/03/2021
- /
- anass AMAZIRH
- /
- 27835

Earth Ocean
- 24/03/2021
- /
- Ayoub IDELKAID
- /
- 7516

Mohammed VI International University Hospital
- 23/03/2021
- /
- wafaa BOUMHAOUD
- /
- 8361

BO 52 by Linkcity
- 27/02/2021
- /
- Zakaria SADIK
- /
- 7321

Environmental Education Center
- 20/06/2019
- /
- Saif Eddine Majdaoui
- /
- 8963