ACLEDA Institute of Business

  • Building Type : School, college, university
  • Construction Year : 2017
  • Delivery year : 2018
  • Address 1 - street : Anlong Kangan Village, Sangkat Khmuonh, Khan Sen Sok 12000 PHNOM PENH, Other countries
  • Climate zone : [Aw] Tropical Wet & Dry with dry winter.

  • Net Floor Area : 25 196 m2

Proposed by :

Certifications :

  • Primary energy need :
    kWhpe/m2.year
    (Calculation method : )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

For years, ACLEDA Bank recruited the largest number of college graduates in Cambodia. As the demand for skilled professionals began to outpace the supply of graduates, ACLEDA Bank decided to build their own business school to address the shortage of higher education institutions. Today, the ACLEDA Institute of Business offers Associate, Bachelor and Master-degree levels for over 3,000 students the fields of business, banking and finance. The school also provides training to over 3,000 additional participants. Students at the ACLEDA Institute of Business study subjects such as micro small and medium enterprise (MSME) lending, financial planning, loan management and more.


ACLEDA Bank also believes that investing in education must be done responsibly. The green campus, which consists of three education buildings, administrative offices, a library and a dormitory, are resource-efficient, allowing for a reduced carbon footprint and lower operational costs. The campus uses less energy and water with features like energy-efficient air-conditioning and a black water treatment recycling system. Construction materials such as cored bricks for walls also reduce the embodied energy in materials.


ACLEDA Bank was first established as a locally owned, non-profit organization that helped rural entrepreneurs gain financing. The bank now employs over 12,000 employees and has more than 250 branches that provide financing to mostly microfinance borrowers and MSMEs. From lending to entrepreneurs to educating its country’s future professionals, ACLEDA Bank is dedicated to the sustainable development of Cambodia. The ACLEDA Institute of Business has received final EDGE certification from thinkstep-SGS.


See more details about this project

 https://www.edgebuildings.com/projects/acleda-institute-of-business/

Data reliability

3rd part certified

Photo credit

Photos courtesy of ACLEDA Business Institute

Contractor

    PISNOKA International Corporation Ltd

    khou_soklay[at]pisnoka.com

Construction Manager

    HSnK Architecture & Engineering Company

    hanoon[at]hsnk.co.kr

Stakeholders

    Investor

    ACLEDA Bank

    acledabank@[at]acledabank.com.kh

    ACLEDA Bank decided to build their own business school to address the shortage of higher education institutions.

Owner approach of sustainability

ACLEDA Bank also believes that investing in education must be done rehesponsibly. They invested and purchased 7.57 Hectares of its own land in area in order to build comfortable building with international standards; likewise, it is also the building that focuses on environmental issues and energy saving, which called Green Building. The green campus, which consists of three education buildings, administrative offices, a library and a dormitory, are resource-efficient, allowing for a reduced carbon footprint and lower operational costs. The campus uses less energy and water with features like energy-efficient air-conditioning and a black water treatment recycling system. Construction materials such as cored bricks for walls also reduce the embodied energy in materials.

Architectural description

This new campus is very nice and specious and has been built according to international standard. It was designed by professional and reputable Architect known HSNK, based in South Korea and has been constructed by main contractor, Pisnoka which is a professional and reputable local construction company and collaborated with 4 subcontractors and 17 furniture, office and electronic materials and equipment supply companies which are totally 22 local and international companies.

Energy consumption

  • 30,00 kWhfe/m2.year
  • 7 kWh/m2.year : cooling Energy
    3 kWh/m2.year : fan energy
    2 kWh/m2.year : hot water
    6 kWh/m2.year : lighting Energy
    10 kWh/m2.year : catering Energy
    2 kWh/m2.year : equipement, lift, STP, water pumps

  • 36,30 kWhpe/m2.year

Envelope performance

    Roof U-value: 1.99
    Wall U-value: 1.86
    Glass U-value: 5.75

Systems

    • No heating system
    • Boiler fuel
    • VRV Syst. (Variable refrigerant Volume)
    • Natural ventilation
    • No renewable energy systems

GHG emissions

  • 24,00 KgCO2/m2/year
  • CO2 Emissions from electricity Generation: 0.8 kg/kWh ; CARBON EMISSIONS: 208.07 tCO₂/Year

Water management

  • 22 344,00 m3
  • 7 m3/day : shower
    8 m3/day : water faucets
    18 m3/day : cafeteria
    25 m3/day : slandscaping
    2 m3/day : other

    Final Water Use: 1862 m³/Month
    Water Savings: 12395.28 m³/Year

Health & Comfort

    This campus has been built and equipped with the security, fire protection, energy conservation, control and telecommunication, occupational health and IT systems at all the buildings.

Product

    Reduced Window to Wall Ratio - WWR of 45.21 %
    Insulation of Roof and external walls
    Variable Refrigerant Flow (VRF) Cooling System - COP of 3.41
    Energy-Saving Light Bulbs for internal and external spaces
    Occupancy Sensors in Bathrooms

    Second œuvre / Plomberie, sanitaire 

    Low-Flow Faucets in All Other Bathrooms - 5.03 L/min
    Single Flush/Flush Valve Water Closets in Bathrooms - 6 lt/ flush
    Water-Efficient Urinals in All Other Bathrooms - 3 L/flush
    EDW11 Black Water Treatment and Recycling System

    Second œuvre / Cloisons, isolation

    Mineral Wool : roof insulation
    Cored bricks with plaster on both sides for internal and external walls
    Cored (with Holes) Bricks with Plaster on Both Sides: Internal Walls
    Cored (with Holes) Bricks with Internal & External plaster: External Walls
    Insulation of External Walls: U-value of 1.95
    Insulation of Roof: U-value of 0.46

Construction and exploitation costs

    Incremental Cost: 241 160.97$
    Payback in Years: 23.09 Yrs.
    To know more about incremental cost: https://www.edgebuildings.com/edge-cost-model/

Energy bill

  • 36 850,97

Building Environmental Quality

  • water management
  • energy efficiency
Cambodia has a tropical climate with warm temperatures throughout the year.

Energy (35% energy savings): Reduced window to wall ratio, insulation of roof, variable refrigerant volume (VRV) cooling system, energy-saving lighting and occupancy sensors in bathrooms.
Water (44% water savings): Low-flow faucets and a black water treatment recycling system.
Materials (32% less embodied materials): Cored bricks with plaster on both sides for internal and external walls.

Contest categories

Energy & Hot Climates

Energy & Hot Climates

Users' Choice

Users' Choice

Green Solutions Awards 2019 - Buildings


Author of the page


  • Other case studies

    More

    Contest

    Green Solutions Awards 2019 - Buildings