  • Building Type : Collective housing < 50m
  • Construction Year : 2015
  • Delivery year : 2015
  • Address 1 - street : PRÍNCIPE DE VERGARA 11 28016 MADRID, España
  • Climate zone :

  • Net Floor Area : 3 935 m2
  • Construction/refurbishment cost : 5 648 762 €
  • Number of Dwelling : 24 Dwelling
  • Cost/m2 : 1435.52 €/m2

Proposed by :

  • Primary energy need
    32.8 kWhpe/m2.year
    (Calculation method : )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building
The entire renovation project for the residential building at 11 Príncipe de Vergara street is based on three key issues:
 - patrimonial and heritage respect, and special admiration for the original 1913 project designed by modernist architect Eugenio Fernández Quintanilla
- creation of unique and sophisticated spaces with all the features that a XXIth century home shall offer
- and special attention paid to people (both users and third parties), environment and energy efficiency
A proof of that is the recuperation of original materials and shapes, the combination of spatial and open rooms, the big and effective isolation systems applied to windows, façades, roofs and floors, the extraordinary gardened areas and the accessibility of all the ground floor spaces.

See more details about this project

 http://www.molior.es/proyectos/rehabilitacion/edificio-principe-de-vergara-11/

Data reliability

Assessor

Stakeholders







Contracting method

Separate batches

Owner approach of sustainability

The developer was advised by the architects team in order to reach these three main goals: respect for the original building, creation of sophisticated and unique spaces, and sustainability of the whole intervention and life cycle.

Architectural description

Everyone who has dealed with the renovation of a listed building like this, has confronted a lot of difficulties in order to achieve the requirements and needs of a XXIth century familiy. The're hard legal restrictions to prevent damages to the cultural values of this kind of buildings. Nevertheless the developer and the architects' team found this issues as an extra motivation to design a highly energy efficient building with great cuts of energy consumption values. For example at the façades the intervention had to be based on a long search of the best insulation options for the interior layer, on the construction and design of new doors and windows based on the original design and with the original materials but with great insulation values; and on the inclusion of high performance glass types. The accessibility of all the ground floor spaces was also a goal to achieve so that everyone can enjoy the great tour through the green spaces that ends at the huge vertical garden of the rear court. This "presence of the green" makes the building a living organism.

Energy consumption

  • 32,80 kWhpe/m2.year
  • 81,80 kWhpe/m2.year
  • 21,00 kWhfe/m2.year
  • 139,20 kWhpe/m2.year

Envelope performance

  • 0,29 W.m-2.K-1
  • Design, shapes, colours, materials, carpentry, quality and any other characteristict of the building façades (both interior and exterior) are law protected. Because of this all the envelope insulation efforts have been concentrated in the interior layers of the envelope:
    - There's a new multilayered reflective material. It works with the dry wall profiles in order to create a very effective closed air chamber
    - There are new timber carpentries with the original design in order to make them able to carry insulated glazing (with air or argon chamber depending on the cases)
    - The roof has been designed with a XPS 12cm. thick layer
    - And the ground floor has been constructed over a cavity system basis that creates a closed air chamber. In addition there is also a MDF board plus a rockwool layer.
    As a result of this constructive systems we have reached the following remarkable data for this latitude:
    U average Ground Floor 0.49
    U average Façades 0.29
    U average Roof 0.19
    U average Windows 1.30

Real final energy consumption

    109 401,00 kWhfe/m2.year

Systems

    • Gas boiler
    • Condensing gas boiler
    • VRV Syst. (Variable refrigerant Volume)
    • Free-cooling
    • Double flow
    • Solar Thermal
  • 60,00 %

GHG emissions

  • 7,80 KgCO2/m2/year

Water management

  • 3 481,00 m3

Indoor Air quality

    There´s a whole plumbing system that recovers the vertical garden watering excess. In addition there is a 2500 l greywater recovery tank for watering purposes.

Product

    There is a double flow mechanical ventilation system that, after passing through a heat exchanger, throws out the interior air. It also has the free-cooling tool in order to reduce air conditioning use by chilling the house during the night.

    ACTIS

    Christophe Hamblot Director ACTIS en España +34 618814348 Email: [email protected]

     http://www.aislamiento-actis.com/


    There are 8 heliostats installed at the roof of the building in order to introduce solar light in the interior courts, specially in the little ones. These heliostats work with a static mirror each, so that the first follows the sun and the second is orien

    Torinco Madera S.L.

    Pedro Torrero Mejías P.I. Sector S2 14630 Pedro Abad (Córdoba) tfno.: 957 186 085 [email protected]

     http://www.torrero-torinco.com/

    There are several systems introduced in the building in order to provide acoustic comfort to the stakeholders:
    - A new floor layer for impact noise absorption.
    - A new rockwool insulation layer over the continuous dropped ceilings
    - And an acoustic and thermal insulating glazing, for doors and windows, with laminated interior and exterior layers (4+4/ 16 / 5+5 SILENCE)

    Siber Zone, S.L.

    C/ Can Macia nº2 08520 Las Franquesas del Vallés Barcelona - España Tel.: 902 02 72 14 / Int. + 34 93 861 62 61

     http://www.siberzone.es/

    IGuzzini

    iGuzzini illuminazione Ibérica S.A. Avda. de la Generalitat, 168-170 Parc d’Activitats Econòmiques Can Sant Joan 8174 Sant Cugat del Vallès (Barcelona) T: 0034 93 5880034 Andrés Santos [email protected] Página web: http://www.iguzzini.es/

     http://www.iguzzini.es/

Construction and exploitation costs

  • 8,89
  • 8 133 653

Urban environment

The building is placed in an urban consolidated prime area of Madrid: the Salamanca District. It´s perfectly connected with the public transport network (three underground lines and several bus ones), surrounded by lots of stores and every kind of service, and real close to Madrid's green lung: the "El Retiro" park.

Land plot area

1 173,00 m2

Built-up area

77,00 %

Green space

290,00

Building Environmental Quality

  • indoor air quality and health
  • acoustics
  • water management
  • energy efficiency
  • renewable energies
  • integration in the land
  • mobility

Building candidate in the category

Rehabilitaciones energéticas

Rehabilitaciones energéticas

Green Building Solutions Awards 2015
PDF

Share :
Author of the page

Santiago Bouzada Biurrun

Senior Architect


Other case studies

More

Contest

Green Building Solutions Awards 2015