Extension of the DON BOSCO Institute to Wolluwe Saint Pierre
- by Geoffrey Vermeulen
- /
- 2019-06-24 15:38:27
- /
- Belgique
- /
- 5519 / FR
New Construction
- Building Type : School, college, university
- Construction Year : 2017
- Delivery year : 2018
- Address 1 - street : avenue du val d'or, 90 1150 WOLLUWE SAINT PIERRE, Belgique
- Climate zone : [Cwb] Mild, dry winter, cool and wet summer.
- Net Floor Area : 3 821 m2
- Construction/refurbishment cost : 6 703 720 €
- Cost/m2 : 1754.44 €/m2
Certifications :
-
Primary energy need :
20 kWhep/m2.an
(Calculation method : )
Contractor
Construction Manager
Contracting method
General Contractor
Owner approach of sustainability
This school, offering varied options in the industrial technical field and in the graphic arts, needed much more space to ensure a comfort worthy of the name to its students.
Since last September, this positive energy building has welcomed electricians, computer scientists and electronics engineers.
This concept, entirely prefabricated and with apparent structural elements, constitutes a real commitment for future generations with its green roofs and its rainwater recovery system.
Architectural description
See Development steps.
Product
insulating wood box

Jonckheere projects
https://www.jonckheereprojects.be/Gros œuvre / Système passif
Prefabricated structure in insulated wood box
Fast system integrating thermal insulation and airtightness. Lets you really "pack" the building and avoid thermal bridges and weak spots for airtightness.
Reasons for participating in the competition(s)
PASSIVE BUILDING
- the heating requirement is maximum 15 kWh / (m².year)
- the cooling requirement is maximum 15 kWh / (m².year)
- the overheating frequency of the building above 25 ° C is maximum 5% of the occupancy time of the building (comfort criterion verified by dynamic thermal simulation)
- The air tightness of the building ensures a leak rate through the envelope of maximum 0.6 air changes per hour at 50 Pa (criterion verified according to report)
- the primary energy consumption is less than or equal to 90 - 2.5 x compactness (expressed in primary KwH / (m².year)
Building candidate in the category

Energie & Climats Tempérés

Santé & Confort

Prix du public
Author of the page
Other case studies

Holiday homes Marrakech Medina - AWB
- 25/03/2021
- /
- Ibtissam GHAZZAR
- /
- 5360

SEMI OLYMPIC SWIMMING POOL COVERED IN SIDI YOUSSEF BEN ALI
- 25/03/2021
- /
- anass AMAZIRH
- /
- 27835

Earth Ocean
- 24/03/2021
- /
- Ayoub IDELKAID
- /
- 7516

Mohammed VI International University Hospital
- 23/03/2021
- /
- wafaa BOUMHAOUD
- /
- 8361

BO 52 by Linkcity
- 27/02/2021
- /
- Zakaria SADIK
- /
- 7319

Environmental Education Center
- 20/06/2019
- /
- Saif Eddine Majdaoui
- /
- 8963