New Construction

  • Building Type : Office building < 28m
  • Construction Year : 2016
  • Delivery year : 2017
  • Address 1 - street : 163, Avenue Mohamed VI SOUISSI RABAT. 10170 RABAT, Maroc
  • Climate zone : [Csa] Interior Mediterranean - Mild with dry, hot summer.

  • Net Floor Area : 2 550 m2

Certifications :

  • Primary energy need
    283 kWhep/m2.an
    (Calculation method : RTCM )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

The project is the design of the new headquarters of ATTIJARI WAFA BANK, it is a building for office use which consists of a Ground floor (RDC) with a floor and a basement. The ground floor and the staircase consist of offices and meeting rooms, and the basement is a parking lot linked to the building.

The building has four façades, two of which are terraced with villas and one with a restaurant and the fourth overlooks Avenue Mohamed VI

Data reliability

3rd part certified

Stakeholders

    Contractor

    Groupe Attijariwafa Bank

    06 69 82 52 86

    Head of Development & Project Management LAG

Contracting method

Other methods

Energy consumption

  • 283,00 kWhep/m2.an
  • 433,00 kWhep/m2.an
  • RTCM

  • 113,00 kWhef/m2.an
  • Heating: 47711.40 Kwh / year cooling: 66671.11 Kwh / year Lighting: 123487.61 Kwh / year Ventilation: 18826.28 Kwh / year Equipment: 158981.57 Kwh / year

Envelope performance

  • 0,93 W.m-2.K-1
  • External wall composition: • Mortar (dry weight 1300): 1.5 cm • Red brick 6 holes: 7 cm • Unvented air blade: 13 cm • Red brick 6 holes: 7 cm • Mortar (Density 1300) : 1.5 cm

    EN 13829 - n50 » (en 1/h-1)

  • 1,00

Real final energy consumption

    113,00 kWhef/m2.an

Systems

    • VAV System
    • No domestic hot water system
    • VRV Syst. (Variable refrigerant Volume)
    • Double flow
    • No renewable energy systems
  • RENEWABLE ENERGY Not included in project

Smart Building

    Presence detectors, Security lighting, Lifts,

GHG emissions

    Dynamic thermal simulation

  • 107,00 KgCO2 /m2
  • 50,00 an(s)
  • Dynamic thermal simulation, HQE repository

Water management

  • 1 061,00 m3
  • The building is powered by the ONEEP network calculation method: target tool 5

Indoor Air quality

    Air quality at the project site is good: The project is far from the industrial environment, fuel-based energy production, and fleets, especially for buses and taxis.

Comfort

    All the requirements of comfort (hygrothermal, visual, olfactory, acoustic) and health (air, water and space quality)

    Été : 24°c , Hiver: 22°c

    The project is far from the sources of noise nuisance

Product

    Marble type BOTTICINO

    Second œuvre / Peinture, revêtements muraux


    CARREAUX DE GRES CERAME MARAZZI BLOCK GREIGE RETT THE 60 X 60CM CODE GR2

    Second œuvre / Revêtements de sol 

Urban environment

Public transport: The site is served by 3 bus lines, Grands and Petits Taxis Espace Verts: The Borough SOUISSI has several green areas

Land plot area

3 834,00 m2

Built-up area

2 250,00 %

Green space

58,00

Parking spaces

The Parking located in the basement,

Building Environmental Quality

  • Building flexibility
  • indoor air quality and health
  • comfort (visual, olfactive, thermal)
  • mobility
  • products and materials

Building candidate in the category

Bas Carbone

Bas Carbone

Santé & Confort

Santé & Confort

Coup de Cœur des Internautes

Coup de Cœur des Internautes

Green Solutions Awards 2017 - Bâtiments
PDF

Share :
Author of the page

Attijariwafa Bank AWB

Maître d'Ouvrage


Other case studies

More

Contest

Green Solutions Awards 2017 - Bâtiments