Territorial Unit for Prevention and Social Action

8683
Last modified by the author on 08/09/2017 - 15:18

New Construction

  • Building Type : Office building < 28m
  • Construction Year : 2014
  • Delivery year : 2014
  • Address 1 - street : 59287 GUESNAIN, France
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.

  • Net Floor Area : 2 217 m2
  • Construction/refurbishment cost : 3 758 638 €
  • Number of Work station : 80 Work station
  • Cost/m2 : 1695.37 €/m2

Certifications :

  • Primary energy need
    36.83 kWhep/m2.an
    (Calculation method : )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

This new building is intended to accommodate a public service. It has been certified HQE tertiary buildings excellent level and has been labeled BBC 2005 Effinergie. It was built to provide new, larger and more functional premises. It will bring together in one place the PMI-maternal and child protection, ESA-social welfare for children, SSD-departmental social service, SPS-health prevention prevention and family planning services.The building of a surface outside net work of 2217 m2 and built on a plot of 2873 m2 consists of 3 levels and attic:

  • A basement for parking staff vehicles and the boiler room.
  • A ground floor reserved for public reception with a space dedicated to parents with young children and rooms for consultation and meeting.
  • A floor dedicated to staff offices.
  • Attic dedicated to the technical premises of ventilation.

Sustainable development approach of the project owner

Respect for the Agenda 21 of the community

- Willingness to develop the environmental approach. This building is one of 35 operations that have been certified in the North Department (including 27 colleges). The HQE cetification and the BBC 2005 certification made it possible to obtain a more rigorous follow-up than a conventional operation.

Architectural description

Thermal insulation from the outside. Concrete walls with cladding. Vegetalized roof.

Stakeholders

    Contractor

    Département du Nord

    Clément GEENENS 03 59 73 33 19 [email protected]


    Designer

    ARCAsite

    Dominique STROJWAS

    Agent Architect


    Thermal consultancy agency

    KHEOPS

    Arnaud FOURMANOIT


    Structures calculist

    ADI

    Christopher KELLE


    Other consultancy agency

    ACT Environnement

    Ludivine BECQUET

    BET HQE


    Other consultancy agency

    ADI Environnement

    Richard QUINET

    BET VRD


    Environmental consultancy

    ADI

    Alain GERMAIN

    OPC


    Environmental consultancy

    DEKRA

    Sébastien CREUZE

    Technical Controller


    Environmental consultancy

    COBAT COPREV

    Philippe RECOLET

    SPS Coordinator

Contracting method

Separate batches

Type of market

Table 'c21_luxembourg.rex_market_type' doesn't exist

Energy consumption

  • 36,83 kWhep/m2.an
  • 128,00 kWhep/m2.an
  • Heating: 11.38 KWHEF / M2.year Ventilation: 3.52 KWHEF / M2.year Eclarage: 6.14 KWHEF / M2.year Auxiliaries: 0.17 KWHEF / M2.year

Real final energy consumption

    21,21 kWhef/m2.an

Envelope performance

  • 0,47 W.m-2.K-1
  • 1,17

Systems

    • Condensing gas boiler
    • Water radiator
    • Individual electric boiler
    • No cooling system
    • Nocturnal ventilation
    • Double flow heat exchanger
    • No renewable energy systems

Urban environment

  • 2 873,00 m2
  • This operation was carried out on land acquired from the city of Guesnain as part of an urban development operation near the city center in partnership with Partenord Habitat. This includes the creation of a public square, a public building parking spaces for users and residents and the establishment of townhouses, some of which are rental. This building in the heart of the district is well served by urban transport (inter-urban bus network).

Product

    ROCKFACADE

    Rockwool

    (+33) 1 40 77 82 82

     http://www.rockwool.fr/produits/

    Gros œuvre / Structure, maçonnerie, façade

    Semi-rigid panel facade thickness 120mm

    No observation

Construction and exploitation costs

  • 539 662
  • 3 746 110

GHG emissions

  • 3,00 KgCO2/m2/an

Reasons for participating in the competition(s)

Building candidate in the category

Energie & Climats Tempérés

Energie & Climats Tempérés

Coup de Cœur des Internautes

Coup de Cœur des Internautes

Prix des Etudiants

Prix des Etudiants

Green Solutions Awards 2018 - Bâtiments
PDF

Share :
Author of the page

Didier CONSTANT


Other case studies

More

Contest

Green Solutions Awards 2018 - Bâtiments