Sport'Co sports complex in Beaucouzé

  • Type de projet : Construction Neuve
  • Type de bâtiment : Gymnase couvert, salle de sport, stade
  • Année de construction : 2019
  • Année de livraison : 2019
  • Zone climatique : [Cfb] Océanique hiver tempéré, été chaud, pas de saison sèche
  • Surface nette : 4 174 m2
  • Coût de construction : 6 000 000 €
  • Nombre d'unités fonctionnelles : 500 Place assise
  • Coût/m² : 1 437 €/m2
  • Coût/Place assise : 12 000 €/Place assise


Modéré par : Hassan ABOUZID

  • Publié le 13 mai 19
    par Camille FAYET|France
    Vue 1673 fois
  • Proposé par :




  • Concours

    Green Solutions Awards 2019 - Bâtiments France

    Santé & Confort
    Prix du public
    Prix des Etudiants


    Environment's respect
    Sobriety

    • Design based on the Négawatt scenario (sobriety, efficiency, renewable energies)
    • A building RT 2012 desired: a passive building proposed and soon positive energy
    • Heating at 12 ° C in sports halls
    • No hot water in the locker room sinks
    • Rainwater recovery for all Wcs
    • Establishment of a GTB to heat, illuminate and ventilate to just the necessary levels
    • Mechanical ventilation only when natural ventilation is not possible

    Efficiency

    • High performance envelope (27 cm LR)
    • High performance equipment:
    • Natural ventilation thanks to external air intake grilles controlled according to the indoor and outdoor temperatures (COLT system)
    • Double flow ventilation with an air sensor system for preheating the air in winter (Aérollagg system)
    • Intelligent ventilation control via a GTB with priority to natural ventilation
    • Natural light well SOLARSPOT
    • 3 air / water PACs that generate low temperature heating and DHW for changing rooms
    • Recovery of EP for sanitary
    • BEPOS level achieved with the rental of the roof for the installation of photovoltaic panels
    • Use of renewable energy: air, water and sun / light

    renewable

    • Preheating the fresh air of a DF unit with air solar collectors
    • Buildings designed for photovoltaic installations
    • Natural ventilation controlled

    Quality of life

    Winter thermal comfort:

    • Comfort temperature 12 ° C sports halls and 19 ° C elsewhere
    • Low temperature radiant ceilings
    • Double-flow ventilation (milk preheating by Aérollagg system)

    Thermal comfort between seasons and summer

    • Natural ventilation all-weather operation controlled via GTB (colt system)
    • Unloaded building discharge (colt system, free cooling)

    Visual comfort:

    • FLJ studies for all premises
    • Glazing polycarbonate glazing with anti-glare treatment
    • Sun protection minimizes direct radiation on all facades
    • Skylight in the locker room
    • Modulation of artificial lighting according to natural intake and practiced sport
    • Implementation of high quality LED luminaire to avoid glare

    Acoustic :

    • Integration of technical equipment in closed or protected premises
    • Technical premises adjacent to buffer rooms
    • Acoustic treatment in all spaces (walls, ceilings)

    Services :

    • Space of conviviality with a bar
    • Meeting room
    • Infirmary
    • Gym: party room

    Economic performance

    • High performance building for a zero energy bill (after photovoltaic installations)
    • Choice of local actors mainly for design and implementation

    Responsible management

    • Internal management at the MOE: CRR Architecture and CRR Engineering
    • Presentation of STD and FLJ calculations at MOA in APS and APD: decision support
    • Monitoring, performance management and maintenance via GTB

    Label/certification


    Localisation

    Site de la Haye , 49070 Beaucouzé France

    Données techniques