New Construction

  • Building Type : Collective housing < 50m
  • Construction Year : 2017
  • Delivery year : 2018
  • Address 1 - street : 41 rue de la justice 59000 LILLE, France
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.

  • Net Floor Area : 2 031 m2
  • Construction/refurbishment cost : 2 800 000 €
  • Number of Dwelling : 30 Dwelling
  • Cost/m2 : 1378.63 €/m2

Proposed by :

Certifications :

  • Primary energy need
    119 kWhep/m2.an
    (Calculation method : )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

The operation is part of a project redevelopment of the islet Justice in the heart of Wazemmes . The 30 apartments labeled PASSIVHAUS constitute a new entry sequence into the PSA Citroën operation. The distribution is organized around two staircases and two individual accesses on the ground floor, with private gardens. In R + 3 rue de la Justice and R + 4 along the future road leading to the heart of islet, the collective adapts to neighboring morphologies.

The building has a subdued gray-beige brick cladding on public facades. As for the parking on the ground floor, transparencies are created using a "mashrabiya" ( architectural element which is characteristic of Arabic residences) . Bricks laid in stretches, light overhang, punctuate the facades at the level of the lighters and aluminum windows. The rigorous berry pattern is contradicted by random balconies with generous overhangs.

Isolated from the outside, the building is equipped with a collective boiler with recovery of greywater and air heat pump . All technical equipments are included in the heated volume. The orientation was particularly worked. The accommodations are doubly oriented from the T3 (2 bedroom flat) .

The outdoor spaces are very green , so as to give a real place to Nature. This becomes a structuring element of the project. The plant palette is similar to that of traditional private gardens.

Sustainable development approach of the project owner

The operation is part of a project redevelopment of the Justice islet - Wazemmes district in Lille. Vilogia, a sustainable development player, wanted to position this operation as the spearhead of the energy transition in the north of France.

Architectural description

This operation intends to play its role as a structuring whole of the site, by means of simple and essential architectural devices. The building contributes to the urban renewal of the site by proposing a new sequence of entry into the PSA Citroën operation. Standing at the corner of the Rue de la Justice and the new service road, the building has two volumes in R + 3 and R + 4 that interact with the neighbors. The orientation was particularly worked. The accommodations are doubly oriented from the T3, all the lounges are South-West or South-East, the rooms give in interior of islet, in order to benefit from a maximum of tranquility. The morphology is voluntarily compact, in order to reach the Passivhaus label. From T2 to T5, the accommodations all benefit from quality outdoor spaces: gardens, balconies, loggias. The parking, located on the ground floor, is lit and ventilated naturally thanks to a brick game forming mashrabiya .

Building users opinion

We have very positive feedback from the occupants and Vilogia about the operation.

If you had to do it again?

Despite close collaboration between the HQE design office and the architect, the false ceilings of the entrances to the dwellings are quite low. HVAC equipment requiring a large plenum height, if it were to redo we would increase the slab to slab heights.

See more details about this project

 https://www.bplusbarchitectures.com/projets/justice-30-logements-passifs

Photo credit

BplusB Architectures

Contractor

Construction Manager

Stakeholders



    Assistance to the Contracting Authority

    Aqua Terra Sana

    M. Seveque - 06 46 22 55 93 - [email protected]

    MASTER


Contracting method

Separate batches

Type of market

Table 'c21_luxembourg.rex_market_type' doesn't exist

Energy consumption

  • 119,00 kWhep/m2.an
  • 170,00 kWhep/m2.an
  • HEATING: 12 KWHEF / (M².AN) VENTILATION: 5 KWHEF / (M².AN) AUXILIARY: 0.2 KWHEF / (M².AN) ECS: 8.6 KWHEF / (M².AN) DOMESTIC ELECTRICITY: 19 KWHEF / (M².AN)

Real final energy consumption

    46,00 kWhef/m2.an

Envelope performance

  • 0,28 W.m-2.K-1
  • BUILDING ENTIRELY IN CONCRETE AND EXTERIOR INSULATION
    U LOW DALLE = 0.123 W / M².K
    UMUR = 0.132 W / M².K
    U ROOF = 0.090 W / M².K
    UW <0.80 W / M².K, SOLAR FACTOR OF GLAZING = 0.60

  • 0,59
  • EN 13829 - n50 » (en 1/h-1)

  • 0,52

More information

NOT YET BACK

Systems

    • Others
    • Heat pump
    • No cooling system
    • Double flow heat exchanger
    • Heat pump

    HEAT RECOVERY ON GRAY WATER SHOWERS

    Enveloppe et menuiseries performantes

Smart Building

    not

Urban environment

  • 1 792,00 m2
  • 44,00 %
  • 410,00
  • The operation is part of a redevelopment project of the Justice islet - Wazemmes district.

    The ground of the project is located rue de la Justice in Lille. The district of Lille Wazemmes consists mainly of grouped individual housing, band houses and collective housing. Industrial rights of way tend to disappear little by little in favor of housing operation.

Product

    PTC Electric Batteries

    Génie climatique, électricité / Chauffage, eau chaude

    1 battery per housing for heating

    The occupants are very satisfied with the thermal comfort


    Internorm PVC / Alu KF410 glazing 3N2 solarXplus

    Second œuvre / Menuiseries extérieures

    U-VALUE FENÊTRES : 0.76 W/(m².K)
    U-VALUE VITRAGES : 0.55 W/(m².K)

    Good use


    Aldes VEX550 C4

    Aldes

     https://pro.aldes.fr

    Génie climatique, électricité / Ventilation, rafraîchissement

    Good use

Energy bill

  • 13 000,00

GHG emissions

  • 24,30 KgCO2/m2/an
  • PHPP CALCULATION

Reasons for participating in the competition(s)

PASSIVE housing, labeled PASSIVHAUS. Implementation of double flow, triple glazed frame, heat pump on gray water, external insulation, collective boiler for DHW.

Building candidate in the category

Energie & Climats Tempérés

Energie & Climats Tempérés

Prix du public

Prix du public

Prix des Etudiants

Prix des Etudiants

Green Solutions Awards 2019 - Bâtiments France
PDF

Share :
Author of the page

Benjamin Boyaval

Architecte


Other case studies

More

Contest

Green Solutions Awards 2019 - Bâtiments France