Danube Elithis Tour

10859
Last modified by the author on 11/05/2020 - 12:04

New Construction

  • Building Type : Collective housing < 50m
  • Construction Year : 2018
  • Delivery year : 2018
  • Address 1 - street : 16 rue Edmond Michelet 67000 STRASBOURG, France
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.

  • Net Floor Area : 6 350 m2
  • Construction/refurbishment cost : 7 200 000 €
  • Number of Dwelling : 63 Dwelling
  • Cost/m2 : 1133.86 €/m2

Certifications :

  • Primary energy need
    64.13 kWhep/m2.an
    (Calculation method : )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

Construction of the first all-purpose positive energy tower in the world. It consists of 67 housing units and 1233 m2 of photovoltaic panels arranged on the roof and on the facades.
With a cost not exceeding 1200 € / m2, it is an innovative but affordable concept for the world.
The Elithis Danube Tower is located at the entrance of the ZAC (joint developement zone) Danube, the advanced figure of this new emblematic district of the new Strasbourg, and the exemplary reconquest of its docks.

Sustainable development approach of the project owner

Respond to the major issues of the 21st century, in terms of:

  • Fight against global warming,
  • Acceleration of the energy transition,
  • Growth of the purchasing power of households,
  • Limitation of urban sprawl and pollution control,
  • Positive integration of digital into the economy of the construction sector,
  • Live better together.

Architectural description

High Architectural Quality

The spirit of the place, the memory of the ports, the soul of the river

An architecture between earth and sky

A form thought with the climate

Bright housing

Enjoy the views

A collective, social, participative adventure

Building users opinion

With an energy consumption 168 times cheaper than an average household in France, the promise made to the occupants is kept. Thus, the various testimonies are laudatory.
See the different articles and reports on this subject: http://www.elithis.fr/articles/

If you had to do it again?

The main construction principles and innovations selected for this project are the good ones. The proof is that after a year of operation the results are satisfying. Therefore, apart from the few settings at the margin, we can only be satisfied, without questioning the ambitious choices that make this project a world first.

See more details about this project

 http://www.elithis.fr/2019/02/28/reportage-au-13h-de-tf1-sur-la-tour-elithis-danube/
 http://www.elithis.fr/2019/01/25/reportage-au-journal-tv-de-la-rtbf-sur-la-tour-elithis-danube/

Photo credit

Crédit photos Mariusz MARCIN

Contractor

Construction Manager

Stakeholders

    Contractor representative

    Egidia

    Xavier DUBEARN


    Thermal consultancy agency

    Bénefficience


    Other consultancy agency

    Elithis Ingénierie

    BET FLUIDS


    Structures calculist

    CTE


    Construction Manager

    ODAXIA

    Chief Execution Management - OPC


    Structures calculist

    Acoustique France


    Company

    SOTRAVEST

    GO Company

Contracting method

Separate batches

Type of market

Table 'c21_luxembourg.rex_market_type' doesn't exist

Energy consumption

  • 64,13 kWhep/m2.an
  • 92,60 kWhep/m2.an
  • Consumption according to calculation RT2012 end of construction site on the whole building (housing + offices) Heating: 31.5 kWhEP / M².an Cooling: 1.00 kWhEP / M².year (for offices only) ECS: 16.83 kWhEP / M².an Lighting: 6.0 kWhEP / M².an Auxiliary: 8.8 kWhEP / M².year Photovoltaic production: 59.2 kWhEP / M².year, that is to say 4.93 kWhEP / M².an residual

Real final energy consumption

    41,05 kWhef/m2.an

    2 018

Envelope performance

  • 0,62 W.m-2.K-1
  • Outside wall: concrete + 200mm glass wool under ventilated cladding (Up = 0.22)
    Roof terrace: concrete + 240mm polyurethane foam under seal (Up = 0.09)
    Floor on solid ground: concrete + 135mm of PSE (Up = 0.19)
    Aluminum joinery with thermal break + extra-clear double glazing (Uw = 1.40) + blackout Motorized sunshade
    Glazed surface = 27% of living space (vs 1/6 for RT2012)
    Heavy inertia
    Air tightness measured at 0.38 m3 / h.m2 (vs 1.00 m3 / h.m2 for RT2012)

  • 0,40
  • EN 13829 - n50 » (en 1/h-1)

  • 0,87

More information

Actual consumption on the housing perimeter: -11 kWhEP per m² / year Average annual invoice per household and per year: 10 € Annual renewable energy production: 110% of needs CO2 emissions: 3 kg m².an / 15 times less than the existing fleet 12 tons of CO2 saved per year thanks to photovoltaics

Systems

    • Urban network
    • Fan coil
    • Others
    • Urban network
    • Water chiller
    • Fan coil
    • compensated Air Handling Unit
    • Double flow heat exchanger
    • Solar photovoltaic
  • 114,00 %
  • Roof R + 17: 329m ² high efficiency PV module (69.7kWc)
    Intermezzo roof: 114m² high performance PV module (24.15kWc)
    SOUTH FACING: 405m² customized PV module (73.7kWc)
    East facade: 385m² customized PV module (51.6kWc)

Smart Building

    ADHUN
    PERSONAL DIGITAL ASSISTANT AT HOME

    Incentive and intuitive, the tool has created a real emulation between tenants.

    At the social heart of the tower, conversations often revolve around the performances of each other. The most virtuous Dulociate competition is "unofficially" open!

Urban environment

  • 600,00 m2
  • 100,00 %
  • The Elithis Danube Tower is located at the entrance of the ZAC Danube, the advanced figure of this new emblematic district of the new Strasbourg, and the exemplary reconquest of its docks.

    The building is bounded by the Dusuzeau Basin and its quay to the north and Edmond Michelet Street to the west, which extends to the north by the Winston Churchill bridge.

    The main access is in the West, Rue Edmond Michelet and its Tramway station, or by the few steps that lead to the Quai du Bassin Dusuzeau.

    A secondary access is located in the east, along the "urban ramp west of the ZAC".

    Near the center and perfectly served by public transport, the Elithis Danube Tower in the heart of the Eco District Danube allows its inhabitants to approach the mobility from a new angle.

    The Elithis Danube Tower profits from excellent connections: it is located in the immediate vicinity of a bus stop and the Winston Churchill tram station (lines C and E) and is included in a very dense network of cycle paths. is also served by three major roads.

    Walking is THE universal mode of transport! The ZAC Danube has an almost flat altimetry conducive to pedestrian movement and ballads along the Quays.

    In order to ensure good walking conditions, the implementation of the Elithis Danube Tower was considered in perfect coherence and connection with the public space. For the transport of young children, La Tour provides families with a local pushchair located on the ground floor of the building.

    The Strasbourg urban area has the largest tramway network in France, with 71.8 km of commercial length, 7 meshed lines including a cross-border line to Kehl (6 tram lines and 1 BHNS line) and 90 stations.

    The site is advantageously served in particular by lines C and E of the tramway. The Winston Churchill stop is located at the foot of the Elithis Danube Tower.

Product

    YZENTIS EVOLUTION FLOOR

    FRANCE AIR

    [email protected]

     https://www.france-air.com/

    Génie climatique, électricité / Ventilation, rafraîchissement

    • Compact technical closet suitable for housing, the "all in one" module
    brings together the three elements necessary for DHW production and comfort
    climate:
    - a high efficiency double flow recuperator,
    - individual hot water batteries,
    - an air treatment unit for the boost.
    • Frame and support frame
    • Plenum, air grating, multizone control

    First project to have installed this innovation
    Support of the manufacturer with the installer for the implementation and adjustment
    Very good regulation of thermal comfort and acceptance / appropriation of occupants

Construction and exploitation costs

  • 689 000,00
  • 20 500 000

Energy bill

  • 659,00

Water management

  • 9 984,00 m3
  • Methodology E + C-

Indoor Air quality

    We spend about 80% of the time in closed places, especially in housing.

    The air we breathe there may be of lower quality than the outside air, sometimes very clearly because the outside air is added to pollutants from the indoor air.

    Floor and wall coverings represent most of the surfaces of a room. Their composition and their implementation largely contribute to the quality of the habitat and more particularly the indoor air.

    In order to ensure healthy indoor air, all interior linings have been chosen to limit the emission of pollutants into the air and are all labeled "indoor air emissions" .

    The Indoor Air Emissions label is a simple and readable indicator of the level of volatile organic compound (VOC) emissions, known as new pollutants from interior coating products (partitions, panels, carpets, wallpapers, paintings ...).

    The emission level is indicated on a scale from A + (low emissions) to C (high emissions)

    All floor coverings in dwellings are labeled B minimum.

    Each unit is equipped with a high-performance ventilation system that guarantees fresh air supply at the level of the joinery in the living rooms and rooms adapted to the use. The "polluted" air is mechanically aspirated by extracting mouths in the wet rooms (washrooms, toilets, kitchen). Their dimensioning has been optimized to ensure sufficient air quality, low noise and easy maintenance, while reducing associated energy consumption.

GHG emissions

  • 4,70 KgCO2/m2/an
  • Methodology E + C-

  • 1 009,00 KgCO2 /m2
  • 50,00 année(s)
  • 1 300,00 KgCO2 /m2
  • the EGES result includes the 4 contributors (PCE, construction site, water and energy)

Life Cycle Analysis

    1009

Reasons for participating in the competition(s)

  • Reduced energy consumption
  • Photovoltaic generation

Building candidate in the category

Energie & Climats Tempérés

Energie & Climats Tempérés

Prix du public

Prix du public

Prix des Etudiants

Prix des Etudiants

Green Solutions Awards 2019 - Bâtiments France