RESIDENCES "4x20 "

6475
Last modified by the author on 20/06/2019 - 14:14
  • Building Type : Collective housing < 50m
  • Construction Year : 1980
  • Delivery year : 2018
  • Address 1 - street : Rue en BOIS, Rue PARADIS et Avenue de l'EUROPE 4040 HERSTAL, Belgique
  • Climate zone : [Cbc] Mild, dry winter, warm and wet summer.

  • Net Floor Area : 7 510 m2
  • Construction/refurbishment cost : 4 370 000 €
  • Number of Dwelling : 80 Dwelling
  • Cost/m2 : 581.89 €/m2
  • Primary energy need
    1980 kWhep/m2.an
    (Calculation method : )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

Complete energy renovation of 4 x 20 PUBLIC HOUSING.

In addition to the installation of a new high performance envelope (WALLS, ROOFS, FRAMES) and the complete replacement of the systems (HEATING, SANITARY, VENTILATION and COMPLIANCE "PEOPLE WITH REDUCED MOBILITY" and ELECTRIC), each of the 4 buildings has registered in a search for a revaluation of the SOCIAL IDENTITY associated with PUBLIC HOUSING.

Building users opinion

The MASTER OF WORK carried out a satisfaction survey, which resulted in a globally high satisfaction rate.

Data reliability

Self-declared

Photo credit

B.A.U.C. JOSSE and TIMMERMANS sc sprl and Christophe JOUNIAUX

Contractor

Construction Manager

Stakeholders

    Company

    Assoc. Momentanée DUCHENE - HULLBRIDGE Associated

    M. Julien HOURLAY

    PROJECT MANAGER

Contracting method

General Contractor

Owner approach of sustainability

COMPLETE and PERENNIAL RENOVATION of 4 PUBLIC HOUSING BUILDINGS (4 x 20): - INSULATION OF EXTERIOR WALLS, with installation of a CLADDING that does not require any particular maintenance - INSULATION OF "CELLARS" FLOORS - ROOF INSULATION - FRAMES REPLACEMENT , DV - REMOVAL OF THERMAL BRIDGES induced by the REMOVAL of "CONCRETE" BALCONIES and their REPLACEMENT by new METALLIC ELEMENTS disassociated from the STRUCTURE- INSTALLATION OF NEW INDIVIDUAL BOILERS "CONDENSING GAS" - IMPLEMENTATION OF MECHANICAL VENTILATIONS, type C (mechanical extraction) - ELECTRICAL COMPLIANCE and FIRE, with installation of LOW CONSUMPTION devices in common areas - COMPLIANCE "PEOPLE WITH REDUCED MOBILITY"

Architectural description

In addition to the desire to meet a significantly improved energy performance, the project wanted to give these public housing projects a new architectural identity. It is reflected in particular by an architecture symbolically inspired by the industrial past of the CITY of HERSTAL, presenting "structured" panels and balconies. The tones are intentionally sober but varied, each building being aesthetically differentiated (shade of cladding, colors of some glazed elements).

Energy consumption

  • 1 980,00 kWhep/m2.an
  • 2 600,00 kWhep/m2.an
  • 6 000,00 kWhep/m2.an

Envelope performance

  • 0,50 W.m-2.K-1
  • 1,40

Systems

    • Condensing gas boiler
    • Water radiator
    • Condensing gas boiler
    • No cooling system
    • Single flow
    • No renewable energy systems

    Possibility of PHOTOVOLTAICS for common.

    No Modification of the Envelope

Smart Building

    Access management connected with PROJECT OWNER (Access by Badges)

Urban environment

    Set of PUBLIC HOUSING in a PERI-URBAN ENVIRONMENT DENSE

  • 375,00 %

Product

    INSULATION - WALL

    IKO INSULATIONS bv

    IKO nv d’Herbouvillekaai 80 B – 2020 Anvers Tel.: +32 (0)3 248 30 00 Fax: +32 (0)3 248 37 77

     https://be.iko.com/fr/

    Gros œuvre / Structure, maçonnerie, façade

    PIR / ENERTHERM Alu - 10cm
    lambda: 0.022

    ACCEPTED by project owner


    INSULATION - ROOF

    UNILIN

    Unilin, Ooigemstraat 3 8710 Wielsbeke Belgium T 32 56 67 52 11 BE 0405.414.072 [email protected]

     http://www.unilin.com/fr

    Gros œuvre / Charpente, couverture, étanchéité

    PIR / UNILIN UTHERM FLAT ROOF - 14cm
    lambda : 0.022

    ACCEPTED by project owner


    ISOLATION on CAVE

    KNAUF

    Rue de Maestricht 95 4600 Visé Belgium

     https://www.knaufinsulation.be/fr

    Gros œuvre / Structure, maçonnerie, façade

    LM / FIBRAROCK A2 35 Clarity - 13.5cm
    lambda: 0.035

    ACCEPTED by project owner

Construction and exploitation costs

  • 4 200 000,00
  • 150 000
  • 4 370 000

Indoor Air quality

    HOUSING INSTALLATION of a COMPLIANT MECHANICAL VENTILATION SYSTEM

GHG emissions

  • 450,00 KgCO2/m2/an
  • PEB - Walloon Region

  • 1 630,00 KgCO2 /m2
  • 80,00 an(s)

Reasons for participating in the competition(s)

BUILDINGS WITH LOW HEATING REQUIREMENTS thanks to the installation of a new insulating envelope (reduced by more than 50%), which are individually insured by means of HEATING PRODUCTION TECHNIQUES with high efficiency (NATURAL GAS, CONDENSATION system). An individualized MECHANICAL VENTILATION ensures in each dwelling the EXTRACTION of STALE AIR, ensuring de facto an optimal comfort for the residents.

This heavy energy renovation optimally combines high level of thermal performance with real ease of management and use by the occupants.

Building candidate in the category

Energie & Climats Tempérés

Energie & Climats Tempérés

Santé & Confort

Santé & Confort

Prix du public

Prix du public

Green Solutions Awards 2019 - Bâtiments
PDF

Share :
Author of the page

Eric TIMMERMANS


Other case studies

More

Contest

Green Solutions Awards 2019 - Bâtiments