EDIFICI ACONCAGUA
- by jordi llovera
- /
- 2015-06-29 12:47:13
- /
- Internazionale
- /
- 13517 / EN
Renovation
- Building Type : Collective housing > 50m
- Construction Year : 1982
- Delivery year : 2011
- Address 1 - street : meritxell 30 00500 ANDORRA LA VELLA, ANDORRA, Andorra
- Climate zone : [Cfc] Marine Cool Winter & summer- Mild with no dry season.
- Net Floor Area : 2 300 m2
- Construction/refurbishment cost : 340 000 €
- Cost/m2 : 147.83 €/m2
-
Primary energy need :
4.5 kWhpe/m2.year
(Calculation method : Primary energy needs )
Reformed building with 27 apartments, applying energy efficiency criteria.
It’s situatedin an alpine zone.
The winter’s minimum temperature is -12°C.
Reduced heating consumption by 82%.
Acting on facade insulation and heating system: thermographic study, 15 to 20cminsulation, triple glazing LowE, blower door test, etc.
See more details about this project
http://www.construction21.org/espana/case-studies/es/aconcagua.htmlhttp://www.construction21.org/articles/fr/low-energy-renovation-winner-2015-aconcagua-andorra.html
Data reliability
3rd part certified
Stakeholders
Designer
ENGINESA [email protected] architects and thermal engineering designerContracting method
Separate batches
Owner approach of sustainability
The goal was to have a building with passive house consumption, in Andorra with very low temperature in winter (-12ºC) for the first time.
Architectural description
Reformed building with 27 apartments, applying energy efficiency criteria.
It’s situated in an alpine zone.
The winter’s minimum temperature is -12°C.
Reduced heating consumption by 82%.
Acting on facade insulation and heating system: thermographic study, 15 to 20cm insulation, triple glazing LowE, blower door test, etc.
Building users opinion
Users are happy because their heating cost is very low and the comfort has increased.
Owner is happy too because he can grow up the price to rent the apartments, even if the users pays less than before (because the heating cost). He is happy too because he has a waiting list to rent their apartments.
Energy consumption
- 4,50 kWhpe/m2.year
- 55,00 kWhpe/m2.year
- 130,00 kWhfe/m2.year
- 212,00 kWhpe/m2.year
Envelope performance
- 0,24 W.m-2.K-1
- 2,90
- 2,40
Real final energy consumption
130,00 kWhfe/m2.year
4,64 kWhfe/m2.year
2 013
Systems
- Heat pump
- Water radiator
- Heat pump
- No cooling system
- Natural ventilation
- No renewable energy systems
- 100,00 %
Smart Building
Product
-
rockwool external pipe insulation 2x5cm each pipe
exterior pipe insulation
very good insulation with this thickness
-
daikin heat pump
Heat pump for heating low temperature (max 50ºC) and high efficiency COP between 2.84 to 3.77, ESEER 3.78.
It works at proportional temperature to outdoor temp to achieve always maximum COP.
We use with this heat pump, existing old radiators (high temperature and high emission) to heat this buiding after refurbishment, working at low temperature and low emission.
-
daikin altherma for DHW
High temperature heat pump to produce domestic hot water (DHW)
Produces low cost hot water. No problems
-
grundfos magna 3 for heating and DHW
Electronic pump with connection to BMS control system, data transmission: pressure (bar), flow (m3/h), instant consumption (W), cumulate consumption (kWh), thermal flow (kWh).
Working at constant temperature function (hot water production) or at constant pressure function (for heating facility)
Sometimes the pump stops without any order
Author of the page
jordi llovera
Director de proyectos sostenibles
Other case studies


DomusLignea
- 05/06/2018
- /
- vincenzo guzzo
- /
- 5794

Residence Visioneire
- 05/06/2018
- /
- vincenzo guzzo
- /
- 7224

REEF SANSONE - Bar Restaurant
- 28/03/2018
- /
- Massimiliano Pardi
- /
- 17808

CASA UD
- 13/03/2018
- /
- Monterisi Tiziana
- /
- 6296

Humanitas University Campus
- 06/06/2017
- /
- Filippo Taidelli Architetto
- /
- 12204