Cohousing SANGIORGIO - FERRARA
New Construction
- Building Type : Collective housing < 50m
- Construction Year : 2015
- Delivery year : 2015
- Address 1 - street : n° 222 - VIA RAVENNA 44124 FERRARA, Italia
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 820 m2
- Construction/refurbishment cost : 1 070 000 €
- Number of Dwelling : 7 Dwelling
- Cost/m2 : 1304.88 €/m2
-
Primary energy need
10 kWhpe/m2.anno
(Calculation method : Primary energy needs )
Data reliability
Self-declared
Stakeholders
Designer
RIZOMA ARCHITETTURE
ARCH. GIOVANNI FRANCESCHELLI
http://www.rizoma.me/Contracting method
General Contractor
Owner approach of sustainability
The goal at the beginning of the project was to share a way of life and time management, to save energy and reuse of all materials of construction, so 'as to share in the choices of construction technology, interior spaces and finishes . The project involved enabling all families to build their own dream to meet their own needs and those of the other components of cohousing.
Architectural description
Compact building on three floors, finishing with plaster and wood paneling, wooden windows and shading, swiveling metal. Metal cover three flaps, one of which is entirely solar.
Building users opinion
Families are making the move and are totally in love with their building.
Energy consumption
- 10,00 kWhpe/m2.anno
- 10,00 kWhpe/m2.anno
Envelope performance
- 0,13 W/m2K
- 0,70
Systems
- Heat pump
- Low temperature floor heating
- Heat pump
- Reversible heat pump
- Floor cooling
- humidity sensitive Air Handling Unit (hygro A
- Solar photovoltaic
- 59,00 %
GHG emissions
- 70,00 anno/i
Life Cycle Analysis
Water management
Product
WOOD PANELS X-LAM

Ferruccio maestrami costruzioni, via del lavoro 7, loiano- Bologna
Ferruccio maestrami costruzioni, via del lavoro 7, loiano- Bologna
http://www.ferrucciomaestrami.it/Opere strutturali / Sistema passivo
The system with load-bearing panels x-lam and composed of wooden elements in 5 layers cut by numerical control machines, do not contain phenolic glues and are mounted with dry plates and titanium screws.
Client, business and technical team are excited to use this technology
Construction and exploitation costs
- 44 000 €
- 1 070 000 €
Urban environment
The building and 'served by public transport, a bicycle path in completion, overlooking a navigable river and and' provided a landing place for boats in the lot affected by the project.
Green space
700,00
Parking spaces
18
Building Environmental Quality
- indoor air quality and health
- works (including waste management)
- acoustics
- comfort (visual, olfactive, thermal)
- waste management (related to activity)
- water management
- energy efficiency
- renewable energies
- building end of life management
- building process
- products and materials