Village of 4 eco friendly rental houses
New Construction
- Building Type : Hotel, boarding house
- Construction Year : 2010
- Delivery year : 2013
- Address 1 - street : Fraissinet 15100 SAINT FLOUR, France
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 210 m2
- Construction/refurbishment cost : 354 166 €
- Cost/m2 : 1686.5 €/m2
-
Primary energy need :
138 kWhep/m2.an
(Calculation method : )
4 Rural biobased Bioclimatic at 1000m altitude, accessible, with successful applications of renewable energy (photovoltaics, solar water heaters, geothermal heating floors, Well "Auvergne").
Recovery of rainwater for toilets and washing machine, water source to 20m, light bulbs, electric hook for vehicles of the same name, solar pool shower ...
Sustainable development approach of the project owner
Photovoltaic, Geothermal, Solar Water Heater, Rainwater, Spring Water, Light Bulbs Low Conso, Wells Canadian Tri-selective, Compost, Recycling glass bottles reuse, Etc ...The pool is covered by a transparent shelter that allows a heating supplement - month of the year from 23 to 32 ° . In wintern geothermal heating to 20 ° to 24 °.
Architectural description
4 Chalets made of wood / spruce.Bioclimatic, Floors Geothermal heating by vertical 2 X 100m, Wall Insulation and Air 20cm foam under roof tiles Omega10 ...
No air conditioning: altitude 1000m
Building users opinion
See assessments on the ad type into Google: "660876 ABRITEL" heading assessments and also says "ABRITEL 868572"
A tourist told me one day in 2011: "Sir with your exemplary achievement you should be recognized of public utility."
If you had to do it again?
Choose by tenders more skilled craftsmen while limiting their number (+ plumber + electrician + heating renewables)
Look for examples of local authorities (unfortunately. .. Examples are scarce ...)
Energy consumption
- 138,00 kWhep/m2.an
- 187,00 kWhep/m2.an
Real final energy consumption
85,00 kWhef/m2.an
Envelope performance
GHG emissions
- 100,00 an(s)
Life Cycle Analysis
Water management
- 90,00 m3
- 150,00 m3
- 60,00 m3
Indoor Air quality
Product
-
BOIS SIPOC Belgique
SIPOC
Chrystelle COUCHOT
Opere strutturali / Tamponamento, Rivestimento, Tenuta
Construction wood planks 40mm spruce
Very competent company in construction of 40mm wood planks. Remarkable accuracy in measurements favoring the limitation of raw material waste (wood).
Urban environment
Near a footpath on the one hand and the traffic route linking St flour C 44 (7000 inhab.). In the village Paulhac, 400 inhabitants.
Of the remaining 2 sides, 2 residential area of 1500m2 each.
GPS N 45.03020 E 3.04150
Land plot area
2 074,00 m2
Built-up area
310,00 %
Green space
200,00
Parking spaces
500m2 of bitumen for 10 locations. 100m2 Motor Handicap accessible path by hydroway
Other case studies


DomusLignea
- 05/06/2018
- /
- vincenzo guzzo
- /
- 5794

Residence Visioneire
- 05/06/2018
- /
- vincenzo guzzo
- /
- 7224

REEF SANSONE - Bar Restaurant
- 28/03/2018
- /
- Massimiliano Pardi
- /
- 17807

CASA UD
- 13/03/2018
- /
- Monterisi Tiziana
- /
- 6296

Humanitas University Campus
- 06/06/2017
- /
- Filippo Taidelli Architetto
- /
- 12204