Le Boreon
New Construction
- Building Type : Isolated or semi-detached house
- Construction Year : 2014
- Delivery year : 2015
- Address 1 - street : 92330 SCEAUX, France
- Climate zone : [Cfc] Marine Cool Winter & summer- Mild with no dry season.
- Net Floor Area : 390 m2
- Construction/refurbishment cost : 1 000 000 €
- Number of Dwelling : 1 Dwelling
- Cost/m2 : 2564.1 €/m2
Certifications :
-
Primary energy need
50 kWhep/m2.an
(Calculation method : RT 2012 )
Environmentally friendly communicating single-family home. Created in the heart of Sceaux, on the edge of the park, replacing an old building too far from current standards
Sustainable development approach of the project owner
Communicating individual house respectful of the environment by its innovative choices from an architectural point of view (wooden structure, vegetal roof ...) and technical (total control in local or remote)Architectural description
Wooden structure with vegetalized roofSee more details about this project
http://www.domopad.com/leboreonStakeholders
Designer
cabinet philippe Giorgi
Philippe GIORGI
http://philippegiorgi.frOther consultancy agency
DomoPad
Philippe ROUX
http://www.domopad.comConnected Building
Contracting method
Separate batches
Type of market
Table 'c21_italy.rex_market_type' doesn't exist
Energy consumption
- 50,00 kWhep/m2.an
- 50,00 kWhep/m2.an
More information
A total control of the energy consumption according to the occupancy of the building allows to optimize the consumption while ensuring an optimal comfort.
Systems
- Condensing gas boiler
- Low temperature floor heating
- Heat pump
- No cooling system
- Humidity sensitive Air Handling Unit (Hygro B
- Heat pump
Smart Building
Urban environment
Product
IPX800

GCE Electronics
TBD
http://gce-electronics.com/fr/Table 'c21_italy.innov_category' doesn't exist SELECT one.innov_category AS current,two.innov_category AS parentFROM innov_category AS oneINNER JOIN innov_category AS two ON one.parent_id = two.idWHERE one.state=1AND one.id = '27'
Central element of the management of the 300 inputs outputs for a complete control of the building. Safety and energy efficiency are optimum while ensuring an exceptional level of comfort.
TBD
905 Router

Helvar
TBD
http://www.helvar.comTable 'c21_italy.innov_category' doesn't exist SELECT one.innov_category AS current,two.innov_category AS parentFROM innov_category AS oneINNER JOIN innov_category AS two ON one.parent_id = two.idWHERE one.state=1AND one.id = '27'
A central element in the management of dimmable lighting to illuminate according to needs and leave nothing on. Coupled with the exclusive use of LED lighting, the energy consumption of the lighting is optimized while ensuring an exceptional level of comfort.
TBD
Heating Control

Moehlenhoff
TDD
http://www.moehlenhoff.de/Table 'c21_italy.innov_category' doesn't exist SELECT one.innov_category AS current,two.innov_category AS parentFROM innov_category AS oneINNER JOIN innov_category AS two ON one.parent_id = two.idWHERE one.state=1AND one.id = '27'
Central element to regulate 11 zones of underfloor heating. Actual setpoints and temperatures can be viewed and controlled locally or remotely, from wall shelves or thermostats. A graphical follow-up of the energy consumption and the temperatures makes it possible to detect over-consumption or situations of discomfort.
TBD
Construction and exploitation costs
- 90 000,00 €
- 1 000 000 €