Gustave André School Extension

5873
Last modified by the author on 16/05/2019 - 12:19

Extension

  • Building Type : School, college, university
  • Construction Year : 2018
  • Delivery year : 2018
  • Address 1 - street : Rue des Ecoles 26120 CHABEUIL, France
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.

  • Net Floor Area : 802 m2
  • Construction/refurbishment cost : 1 800 000 €
  • Number of Pupil : 170 Pupil
  • Cost/m2 : 2244.39 €/m2

Certifications :

  • Primary energy need
    kWhep/m2.an
    (Calculation method : RT 2012 )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

Envelope:

  • Wood frame walls
  • Biosourced insulation: compressed straw 40 cm in walls and roof (R = 7 m²K / W) -Metallery in metal Uw <1.6 W / m²K-Sunscreen type Roller shutter or sunshade outside direction (according to orientation)

systems:

  • Connection to existing gas boiler of the school group
  • Emissions by room-driven radiators by 2-way valve - Double Flow ventilation (82% heat recovery, by-pass for summer conditions) - Photovoltaic panels: 224 m²

Sustainable development approach of the project owner

The main objective is twofold:

  • aim for energy excellence, with the BEPOS Effinergie level, and make the building an exemplary case of compensation for energy consumption through local production
  • incorporate a maximum of local materials and biobased, through the facade and wood frame, with insulation by straw bales (choice of companies and local suppliers)

Architectural description

This building presents a mixed structure:

  • The superstructure of the building is of the post / concrete beam type, with slab and intermediate floors also provided in concrete, so as to provide the necessary thermal inertia for the building
  • All facades, as well as the roof are made of wood / straw construction.

Photo credit

Simon Barret

Contractor

Construction Manager

Stakeholders




Contracting method

General Contractor

Type of market

Table 'c21_italy.rex_market_type' doesn't exist

Energy consumption

  • -87,00 kWhep/m2.an
  • RT 2012

    50% related to heating 5% ECS 13% lighting 1% distribution auxiliary 21% Ventilation auxiliaries 7% others (current outlet, etc ...)

Real final energy consumption

    33,50 kWhef/m2.an

    2 018

Envelope performance

  • 0,42 W.m-2.K-1
  • Box wall wood / straw with straw boots 40 cm thick U = 0.177 W / m²K
    Roof timber frame + straw box U = 0.186 W / m²K
    Low floor on solid ground, continuous insulation U = 0.174 W / m²K
    Aluminum joinery Uw = 1.6 W / m²K

  • 0,44
  • I4

  • 0,72

More information

The perfromances described above are derived from the calculation RT2012 and the calculation of consumption outside the scope RT (ratio) The renewable energy contribution allows to speak of positive energy building with needs of -88.5 kWhef / m2.an

Systems

    • Low temperature gas boiler
    • Water radiator
    • Individual electric boiler
    • No cooling system
    • Double flow heat exchanger
    • Solar photovoltaic
  • 317,00 %
  • The low temperature boiler used is the existing one, feeding the other part of the school

    Brise Soleil Orientables

Smart Building

    Simple and efficient management of HVAC systems: V2V-driven radiators and thermostats in every classroom.

Urban environment

    Located near the center of Chabeuil, 5 minutes walk from the town hall, the school is bordered:

    - college Marc Seignebos, in the immediate vicinity to the east of a district pavilion (single houses mainly) all around

Product

    Straw boot insulation

    Etablissement Die

    [email protected]

     http://www.die-fourrage.fr/

    Table 'c21_italy.innov_category' doesn't exist SELECT one.innov_category AS current,two.innov_category AS parentFROM innov_category AS oneINNER JOIN innov_category AS two ON one.parent_id = two.idWHERE one.state=1AND one.id = '9'

    Straw and fodder set in wooden box for insulation façade and roof

    Easy installation


Construction and exploitation costs

  • 46 326,00
  • 330 905
  • 2 737 553
  • 1 025 169
  • All costs above include VAT

Indoor Air quality

    Double flow ventilation with filters and flow rates measured at reception to ensure good air quality

Comfort

    Utilisation de la STD pour vérification des températures estivales - optimisation choix et orientation des vitrage

    Calcul de Facteur de Lumière du Jour via le logiciel Dialux

GHG emissions

  • 4,70 KgCO2/m2/an
  • Based on RT2012 consumption

Life Cycle Analysis

    Use of straw to insulate thermally and acoustically the walls facing the outside + wood frame

Reasons for participating in the competition(s)

The building is under construction timber frame, and the entirety of the external facades is isolated by straw boots (from the department). This choice comes from a desire to build using local and duplicable resources, low emitting greenhouse gases.

Building candidate in the category

Bas Carbone

Bas Carbone

Prix du public

Prix du public

Prix des Etudiants

Prix des Etudiants

Green Solutions Awards 2019 - Bâtiments France
PDF

Share :
Author of the page

Simon Barret


Other case studies

More

Contest

Green Solutions Awards 2019 - Bâtiments France