  • Tipologia di progetto : Nuova costruzione
  • Tipo di edificio : Condominio di altezza superiore a 50 m
  • Anno di costruzione : 2018
  • Anno di consegna : 2018
  • Zona climatica : [CsC] Interior Mediterranean - Mild & dry summer.
  • Superficie utile calpestabile : 45 843 m2
  • Costo di costruzione/ristrutturazione : 26 000 000 €
  • Numero delle unità funzionali : 361 Appartamenti
  • Costi/m2 : 567 €/m2
  • Costi/Appartamenti : 72 022 €/Appartamenti


Moderato da : Sylvain Bosquet

  • Pubblicato il 28 maggio 18
    da Germán Velázquez Arizmendi|España
    Visto 8057 volte


  • Concorsi

    Green Solutions Awards 2018 - Edificios

    Energía & Climas Temperados
    Bajo Carbono
    Premio de los Usuarios


    Being the highest certified Passivhaus building in the world, it implies a huge improvement in energy efficiency. On a building that complies with current regulations, and with an Energy Rating A, the reduction in heating demand will be of 80%!

    There are several issues to highlight in this project, which make it an example of global sustainability:

    -Construction traditional: It is a really remarkable aspect, the building has been built with construction techniques and conventional materials such as concrete for the structure, brick, plaster, etc. It was a premise to be able to use the same materials that are commonly used by the administration.

    -Passivhaus XXL: Its scale has meant that many constructive issues have had to be reconsidered, in order to make it viable in a building of this size. There have been times when there were more than 125 people working simultaneously in the work, it has been vital to have a great organization by the construction company, Sukia, and the Facultative Directorate, #VArquitectos.

    -Social housing: There is no typology in which it makes more sense to improve construction in order to achieve the category of passive building or almost zero consumption. In this way, energy poverty situations will be avoided, maintaining maximum interior comfort, and minimizing after sales maintenance.

    -Low cost: The budget is within the parameters established by the Basque Government for VPO construction cost. It has been necessary a deep study of all the solutions and materials to obtain the maximum benefits, maintaining the best durability without an extra cost.

    Conclusion: if it has been possible in this case and with these premises, we have the certainty that any project developed correctly can meet the necessary requirements to be considered passive or almost zero consumption.


    Schema di certificazione


    Localizzazione

    Calle del Pontón 10, Bolueta , 48004 Bilbao España

    Technicals Features