Restaurant KOH

  • Tipologia di progetto : Ristrutturazione
  • Tipo di edificio : Ristorante
  • Anno di costruzione : 2018
  • Anno di consegna : 2018
  • Zona climatica : [Csb] Coastal Mediterranean - Mild with cool, dry summer.
  • Superficie utile calpestabile : 122 m2
  • Costo di costruzione/ristrutturazione : 200 000 €
  • Numero delle unità funzionali : 30 Posti
  • Costi/m2 : 1 639 €/m2
  • Costi/Posti : 6 667 €/Posti


Moderato da : Sylvain Bosquet

Casi studio simili

REEF SANSONE - Bar Ristorante

L’idea Progettuale nasce dall’esigenza di realizzare un’opera che diventasse una struttura a servizio della spiaggia di Sansone Isola d’Elba, fra le dodici spiagge più belle d’Italia, secondo la nota rivista di viaggi americana Condé (...)


  • Pubblicato il 15 giugno 18
    da Micheel Wassouf|España
    Visto 3846 volte


  • Concorsi

    Green Solutions Awards 2018 - Edificios

    Energía & Climas Temperados
    Premio de los Usuarios


    The restaurant KOH is the first refurbished in Barcelona of a gastronomic  following the EnerPhit criteria. This international seal is the adaptation of Passivhaus for the case of rehabilitation. EnerPhit provides a protocol for buildings with very low energy consumption, combined with high thermal comfort. It is calibrated to achieve optimal energy rehabilitation in the life cycle of the building. In other words, the initial construction costs and energy consumption savings are valued throughout the life of the building. The restaurant KOH, which opened its doors at the end of February 2018, is being monitored by the team of Energiehaus, to be able to check that the adapted strategies and solutions really turn into the expected values ​​of low consumption (kWh) and thermal comfort and health (ppm CO2).

    The economic analysis of the offers of several contractors has shown that the extra cost to reach this standard is relatively low, of 5% in the case of the awarded contractor. The annuity that the promoter will pay (sum of mortgage and energy consumption) is from the first year lower compared to a less efficient variant, according to the Spanish building technical code. Our main strategies of action have been: continuous thermal insulation throughout the enclosure, Passivhaus type windows for warm weather, double flow ventilation with Passivhaus certificate, high air tightness and heat pump for heat and cold.


    Schema di certificazione


    Localizzazione

    C/Pujades 133b , 08005 Barcelona España

    Technicals Features