London Aquatic Center
New Construction
- Building Type : Swimming pool
- Construction Year : 2012
- Delivery year : 2012
- Address 1 - street : Olympic Park E20 2ZQ LONDON, United Kingdom
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 42 866 m2
- Construction/refurbishment cost : 331 000 000 €
- Number of Shower/day : 17 500 Shower/day
- Cost/m2 : 7721.74 €/m2
-
Primary energy need
794 kWhpe/m2.year
(Calculation method : Other )
See more details about this project
http://www.zaha-hadid.com/architecture/london-aquatics-centre/Contractor
Construction Manager
Stakeholders
Construction Manager
Glenn Morley et Sara Klomps
Manufacturer
Architen Landrell Associates (ALA)
Address: Station Road, Chepstow NP16 5PF. Contact: 01291 638200. Email: [email protected]
http://www.architen.com/Designer
Tensys (Design office)
http://www.tensys.com/contact/
http://www.tensys.com/Manufacturer
Serge ferrari
ZI BP 54 38352 LA TOUR DU PIN CEDEX Tél : 04 74 83 59 59 Fax : 04 74 83 59 44
https://www.sergeferrari.com/Energy consumption
- 794,00 kWhpe/m2.year
- 3 249,00 kWhpe/m2.year
Envelope performance
Real final energy consumption
2 017
Systems
- Urban network
- Heat pump
- Combined Heat and Power
- Others
- Heat pump
- Other hot water system
- Reversible heat pump
- Others
- VAV Syst. (Variable Air Volume system)
- Others
- compensated Air Handling Unit
- Biomass boiler
- Other, specify
Smart Building
Urban environment
- 21 897,00 m2
- 75,00 %
Product
Precontraint 1202 S2 Black out NPP Roof

Serge Ferrari
ZI BP 54 38352 LA TOUR DU PIN CEDEX Tél : 04 74 83 59 59 Fax : 04 74 83 59 44
https://www.sergeferrari.comSecond œuvre / Cloisons, isolation
Totale surface : 18,000m²
Light construction system
The fully demountable wings are covered with 18,000 m² of opaque Precontraint 1002 S2. A lightweight construction solution, this composite membrane seals the roof and contributes to the building's luminous and thermal ambience. Paradox of the structure, the composite membrane that is usually suitable for curves is used here in flat interlining, in spans of 7 meters. It slides in aluminum profiles fixed on the steel frame. The Serge Ferrari composite is NPP * and guarantees the required level of resistance, aesthetics (whiteness and brilliance) and the imposed fire classification rating Euroclass B-s2, d0. Serge Ferrari is the only manufacturer of the sector to have risen to the challenge.
Stamisol FT 381 NPP

Serge Ferrari
ZI BP 54 38352 LA TOUR DU PIN CEDEX Tél : 04 74 83 59 59 Fax : 04 74 83 59 44
https://www.sergeferrari.comGros œuvre / Structure, maçonnerie, façade
Totale surface : 7,000m²
Exterior security cladding for stands
7,000 m² of white Stamisol FT 381 openwork composite material envelops and secures the temporary stands. Its intrinsic characteristics and its recyclability have been decisive in the choice of material: Stamisol FT 381 reduces heat transmission and promotes air circulation with a porosity of 28%, thus helping to regulate the hygrometry of the interior space. Designed for large ventilated facades, Stamisol FT is of unparalleled strength. It is rated B-s2, d0 and is 100% recyclable.
Construction and exploitation costs
- 331 000 000 €
Life Cycle Analysis
Water management
- 40 000,00 m3
- 2 700,00 m3
Indoor Air quality
GHG emissions
- 53,60 KgCO2/m2/year
- 25,00 year(s)
- 1 340,00 KgCO2 /m2
Reasons for participating in the competition(s)
The London Aquatic Center symbolizes the environmental approach of the organizer: build permanent structures if they can be used after the event or temporary, where appropriate. Thus, only the central part (2,500 places) is preserved as Olympic legacy. The wings, which offeredadditional capacity of 15 000 seats, are today dismounted. Composite materials used for the roof and outer walls have been removed, packaged and shipped at Texyloop, to generate raw materials of second low environmental impact generation. [non final version]Building candidate in the category

Low Carbon