CLT multicomfort office building
New Construction
- Building Type : Office building < 28m
- Construction Year : 2014
- Delivery year : 2016
- Address 1 - street : DN 11 525300 RECI, COVASNA, Romania
- Climate zone : [Dfb] Humid Continental Mild Summer, Wet All Year
- Net Floor Area : 1 058 m2
- Construction/refurbishment cost : 1 587 000 €
- Number of Work station : 60 Work station
- Cost/m2 : 1500 €/m2
-
Primary energy need
16.36 kWhpe/m2.year
(Calculation method : )
In March 2014, Tecto Arhitectura was appointed to design the new office building for HSR factory in Reci, Covasna, as the first large scale project with CLT structure in south-east Europe. The main challenge was to create an office building for around sixty people that had to provide also an visual interface between two antagonistic spaces – an industrial platform used for production and a natural landscape with strong horizontal lines.
The project purpose was to design a flag-ship two-storey office building with a massive timber structure (according to the Austrian and Romanian building regulations), that follows also the standards for Multi Confort criteria (according to the guidelines enlisted by Saint Gobain). Nevertheless the project strategy was based on utmost ecological and long-term sustainability.
The team work between Tecto Arhitectura, the client and the project partners was to create an office building typology based on ecological and long-term sustainability as demonstration project and consequently to establish it in the market-financed office building market. The design work-flow followed four major objectives:
Mix timber construction: massive timber construction and glue laminated elements, industrially produced prefabrication.
Standards for Multi Comfort from Saint Gobain: individually room-controlled comfort and high-quality work environment, increased noise protection, passive construction method for insulation and airtightness, ventilation system with heat recovery.
Ecological concept: use of geothermal energy and high efficiency biomass cogeneration plant for heating and electricity, timber construction, optimization of utilities costs, green roofs, enhanced daylight autonomy, increased degree of recyclability for the entire building.
The rather ambitious goals set by owner in general as well as the additional provisions foreseen by the modules of subsidy could be realized to an even greater extent.From the current perspective - subject to the short operation time – it can be said, that the project has been a great success. Besides that, the building was subject of various site measurements, tests and evaluation of users’ satisfaction.
More than that, the office building has a very good energy efficiency, the energy certificate issued having a specific annual energy consumption (kWh/m2year) of 16.36 and a emission index equivalent CO2 (kgCO2/ m2year) of 1.22.
Already during the project development, a close cooperation between the partners was established. Without such engagement – also from the involved authorities, planners and builders, systems providers – at present it would not be possible to realize comparable projects and competitive construction costs. Therefore, such projects should be still considered as demonstration projects and analysed from this point of view.
The main challenge of the project was to create an office building for around sixty people that had to provide also an visual interface between two antagonistic spaces – an industrial platform used for production and a natural landscape with strong horizontal lines.
The project’s purpose was to design a flag-ship two-story office building with a massive timber structure (according to the Austrian and Romanian building regulations), that follows also the standards for Multi Confort criteria (according to the guidelines enlisted by Saint Gobain). Nevertheless, the project strategy was based on utmost ecological and long-term sustainability.This is the first large scale project with CLT structure in south-east Europe.
See more details about this project
http://tecto.ro/portfolio/wood-offices-birouri-lemn/http://www.rigipstrophy.ro/proiecte/detaliu/36/cladire-birouri
https://www.archdaily.com/886638/clt-multi-confort-office-building-tecto
https://inhabitat.com/green-roofed-office-is-the-first-large-scale-clt-structure-in-southeast-europe/
http://www.archilovers.com/projects/213726/first-clt-multi-comfort-office-building.html
Contractor
Construction Manager
Stakeholders
Designer
TECTO ARHITECTURA
STR. BRAILITA, NO. 44, BUCHAREST
http://tecto.ro/ARCHITECT
Type of market
Realization
If you had to do it again?
Already during the project development, a close cooperation between the partners was established. Without such engagement – also from the involved authorities, planners and builders, systems providers – at present it would not be possible to realize comparable projects and competitive construction costs. Therefore, such projects should be still considered as demonstration projects and analysed from this point of view.
Anyhow, the users were so satisfied that the owner, now expanding its business, contracted TECTO Arhitectura for a second office building, similar to this first one.
Building users opinion
“The Reci headquarter expresses credibility and confidence to all those visiting it. The image benefits are evident every time our partners praise the interior spaces having wide windows, effective ventilation and heating systems, which make us feel wonderful. Moreover, the spacious and properly equipped conference rooms give the premises for any meeting to be a successful one. On one hand, the building offers the optimum space for greeting partners and clients and, on the other hand, it also states the fact that the structure of the company is well consolidated, as the open space offices and their subtle organization encourage collaboration among colleagues and closeness to all facilities. ” (Adrian Radu, General Manager)
“The exterior combines the classical wood finish with our distinct shade of orange, in a linear geometry coming out of the green surroundings.
The structural solution puts emphasis on the specificity of our company, as the building sustains itself entirely on wood. Just imagining how working a day in such an office is can make one want to come work for our company. Besides, the atmosphere is so family-like! ”
(Katalin Sárkány, Head Accountant)
„The building creates a cheerful and warm ambience, which makes you think about nature. Also, the welcoming and serene interiors accommodate both effectively working and enjoyable breaks.”
(Anna Orosz, PR)
“What I like best about this building is the fact that it uses wood in a modern fashion. Many of the buildings in this area use wood as well, but none of them in a similar unconventional manner, making it unlike anything I have seen before. The wood pillars, beams and finishes complete the marble and glass surfaces, fashioning an impressive interior. ”
(Melinda Tunya, Accountant)
Energy consumption
- 16,36 kWhpe/m2.year
- 192,00 kWhpe/m2.year
Envelope performance
- 0,12 W.m-2.K-1
- 0,46
- 0,60
More information
Project’s results
Specific annual energy consumption: 16.36 kWh/m2year
Specific annual energy consumption from renewable sources: 81.78 kWh/m2year
Heat Recovery Ventilation:
Required yield: maximum 6-7 shifts/hour.
CTA: maximum rated power 15,000 cm/hour.
Function:
The volume of cm/hour and the fresh air intake is automatically adjusted by the number of people (air consumption, CO2 sensor) and after cooling the rooms in summer.
Winter Heating season:
Theoretically: The heat recovery has a 80% efficiency at a nominal power of 15,000 cm/hour.
In real practice: The maximum volume reached an average of 6000 cm/hour, (40% of the projected power) with a 91% recovery of heating energy.
Summer cooling season:
Theoretically, the recovery system has a 30% rated output of 15,000 cm/hour
In real practice: The maximum volume has reached 9,000 cm/ hour (60% of the projected power) with a 45% recovery of cooling energy.
Real final energy consumption
16,36 kWhfe/m2.year
16,36 kWhfe/m2.year
16,36 kWhfe/m2.year
2 016
Systems
- Geothermal heat pump
- Combined Heat and Power
- Low temperature floor heating
- Heat pump
- Geothermal heat pump
- Natural ventilation
- Double flow heat exchanger
- Heat pump (geothermal)
- 100,00 %
Smart Building
Urban environment
- 695 291,00 m2
- 1 655,00 %
- 1 000,00
Product
RIGIPS: / Fire rated and partition walls and ceilings, Active Air, Rigips fonic, Gyptone-Rw: 13, Rw: 55, Rw: 46, EI 90, EI30

RIGIPS SAINT GOBAIN
http://www.rigips.ro/
http://www.rigips.ro/Second œuvre / Cloisons, isolation
Acoustic, Durability, Design, Humidity and fire resistance
All products were highly valued and appreciated during use, through their result in comfort and efficiency.
GLASS PLAINCLEAR COOL-LITE SKN, PLAINCLEAR PLAINTHERM XN-Solar

SAINT GOBAIN
http://saint-gobain.ro/
http://saint-gobain.ro/Second œuvre / Menuiseries extérieures
Solar control, Acoustic, Security Solar factor g value 0.37, Thermal resistance 0.6
All products were highly valued and appreciated during use, through their result in comfort and efficiency.
Isover PLA120+100, Isover Akusto Twin, Isover Akusto 75, Isover TDPT 50-

ISOVER SAINT GOBAIN
http://www.isover.ro/
http://www.isover.ro/Second œuvre / Cloisons, isolation
All products were highly valued and appreciated during use, through their result in comfort and efficiency.
Thermal insulation, Durability, Phono insulation ΔRw (dB): 44, ΔRw (dB): 42, ΔLw (dB): 29, thermal resistance: 3.4+2.85, 1.9, 1.25, 1.5
Superflex 100, D2, Max

Weber
https://www.weber.ro/pagina-principala.html
https://www.weber.ro/pagina-principala.htmlGros œuvre / Charpente, couverture, étanchéité
Waterproof, Resistance
All products were highly valued and appreciated during use, through their result in comfort and efficiency.
SHADING DEVICES WAREMA E80 A6 S
WAREMA
https://www.warema.com/en/
https://www.warema.com/en/Gros œuvre / Système passif
functional
All products were highly valued and appreciated during use, through their result in comfort and efficiency.
FRONT WA VAPOUR CHECK AND AIRTIGHTNESS PLOYETHILENE MICROFIBRE MEMBRANE
PROCLIMA
Proclima
https://proclima.com/productsGros œuvre / Charpente, couverture, étanchéité
resistance, high quality
All products were highly valued and appreciated during use, through their result in comfort and efficiency.
Green terrace
Optigreen
https://www.optigreen.com/
https://www.optigreen.com/Gros œuvre / Charpente, couverture, étanchéité
easy to maintain and install, aesthetic qualities
All products were highly valued and appreciated during use, through their result in comfort and efficiency.
Lighting devices, Efficient modular LED lighting systems
Zumtobel
http://www.zumtobelgroup.com/en/
http://www.zumtobelgroup.com/en/Génie climatique, électricité / Eclairage
All products were highly valued and appreciated during use, through their result in comfort and efficiency.
All products were highly valued and appreciated during use, through their result in comfort and efficiency
Industrially produced prefabrication of wood-construction
KLH Massivholz in cooperation with Zimmerei Franz Galler.
http://www.klhuk.com/
http://www.klhuk.com/Gros œuvre / Structure, maçonnerie, façade
resistance, aesthetics
All products were highly valued and appreciated during use, through their result in comfort and efficiency.
Life Cycle Analysis
Water management
Indoor Air quality
Comfort
GHG emissions
- 1,22 KgCO2/m2/year
- 50,00 year(s)