6 Pancras Square
- by Patricia Bourgain
- /
- 2016-07-08 15:20:07
- /
- International
- /
- 11052 / EN
New Construction
- Building Type : Office building < 28m
- Construction Year : 2015
- Delivery year : 2015
- Address 1 - street : Pancras Square N1C LONDON, United Kingdom
- Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.
- Net Floor Area : 38 643 m2
- Construction/refurbishment cost : 100 899 500 €
- Cost/m2 : 2611.07 €/m2
-
Primary energy need :
49.26 kWhpe/m2.year
(Calculation method : Other )
The property will be developed to the highest environmental standards (BREEAM Excellent) and specification.
The development includes:
- 350,000 sq ft of offices
- 10,000 sq ft of retail
- a 3,800 sq ft staff fitness centre
- 27 parking spaces
Stakeholders
Developer
BNP Paribas Real EstateDesigner
Wilmotte & Associés SA +33 (0) 1 53 02 22 22 Design ArchitectDesigner
Adamson Associates Executive ArchitectStructures calculist
AKTOther consultancy agency
Hoare Lea Services EngineerOther consultancy agency
Confluence Health and safety consultantOther consultancy agency
Aecom Fire Strategy ConsultantOther consultancy agency
Reef Associates Facade access consultantOther consultancy agency
Buro Happold Facade design consultantOther consultancy agency
Gleeds Quantity Surveyors Quantity SurveyorIf you had to do it again?
We would reduce the complexity of the building comissioning
Energy consumption
- 49,26 kWhpe/m2.year
Envelope performance
- 1,00
- 3,50
Product
-
Natural ventilation
Génie climatique, électricité / Ventilation, rafraîchissement
features were inserted in the design wherever possible and with an understanding of the site constraints and acoustic obligations. This was combined with a highly efficient mechanical ventilation system with exhaust air heat recovery.
-
Turbo core chiller systems
Génie climatique, électricité / Ventilation, rafraîchissement
Ultra efficient ‘turbo core’ chiller systems using high-speed axial compressors, with the compressor turbine floating on magnetic bearings to eliminate friction in the main moving part, achieve demanding energy efficiency levels. Cooling systems built into the chillers pre-cool the chilled water from the building at low external ambient temperatures without the use of refrigeration equipment.
-
Low carbon district heating network
Génie climatique, électricité / Chauffage, eau chaude
The building benefits from connection to the King’s Cross low carbon district heating network, including heat from a mixture of CHP, efficient gas boilers and potentially Biomass boiler systems.
Biodiversity approach
- 100,00 %
Comfort
Author of the page
Other case studies


Vortex (Switzerland)
- 11/01/2023
- /
- Yasmina Sandoz
- /
- 338

The School of the "Chat Perché" (France)
- 10/01/2023
- /
- Florence Devernay
- /
- 340

Revitalization of the Bourg Center
- 06/12/2022
- /
- Emmanuel d'Envirobat Centre
- /
- 282

Former Lapaire School of Sancoins
- 06/12/2022
- /
- Emmanuel d'Envirobat Centre
- /
- 301

Renovation of the café-restaurant “la Croix des Gardes”
- 28/11/2022
- /
- Gwennaël Liger
- /
- 351