Revitalization of the Bourg Center

2002
Last modified by the author on 06/12/2022 - 10:46

New Construction

  • Building Type : Other building
  • Construction Year : 2020
  • Delivery year : 2021
  • Address 1 - street : 250 Rue Marcel Donette 45700 PANNES, France
  • Climate zone : [Cfb] Marine Mild Winter, warm summer, no dry season.

  • Net Floor Area : 1 785 m2
  • Construction/refurbishment cost : 5 716 373 €
  • Number of none : 6 none
  • Cost/m2 : 3202.45 €/m2

Proposed by :

  • Primary energy need
    81 kWhep/m2.an
    (Calculation method : RT 2012 )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

The operation concerns the design of a new heart of the City, in connection with the existing Town Hall, within a site in full requalification (subdivisions in the course of realization, project of modification of the road network, rehabilitation of the 'old train station). This operation offers the city of Pannes both shops and services as well as spaces for care, work and relaxation. Local companies have been favored (95% of the work) and the buildings constructed are energy efficient.

The organization of buildings and flows takes into account the needs and uses of residents and users. The treatment of outdoor spaces plans to develop quality green spaces, punctuated by forecourts.

A building made from local biosourced materials

Within this urban renewal project, the central building of the Center Bourge is built according to the following construction methods:

  • Wooden frame walls with insulation distributed in straw;
  • Insulating joist-slab floors;
  • Wooden floor structure;
  • Traditional framework;
  • Insulation in blown cellulose wadding.

The straw comes from crops in the town of Pannes. It was stored by the city on its territory to then be installed in the wooden frame walls by the UTB carpenter in Villemandeur (<8 km from the construction site). The prefabricated elements were then assembled on site.

Photo credit

Vincent Bourgoin

Contractor

Construction Manager

Stakeholders

    Thermal consultancy agency

    ECR - ECI

    contact[a]ecr-eci.fr



    Company

    Bidet Isolation


    Company

    Etablissement Riguet


    Company

    Revil maçonnerie


    Designer

    Vincent Bourgoin Architecte

Energy consumption

  • 81,00 kWhep/m2.an
  • 81,00 kWhep/m2.an
  • RT 2012

Systems

    • Heat pump
    • Individual electric boiler
    • No cooling system
    • Humidity sensitive Air Handling Unit (Hygro B
    • No renewable energy systems

Product

    Timber frame walls, straw filling

    UTB

    Utb has specialized for several years in the manufacture and installation of timber frame walls.
    Indeed, wood has become a very good alternative to concrete, it has many thermal, environmental and aesthetic advantages.
    Thus, buildings made of wooden frames guarantee natural and efficient insulation for its users.
    At the request of the City of Pannes, which wanted to favor local materials, the walls are insulated with local straw.

Construction and exploitation costs

  • 5 716 373
  • Cost excluding VRD and land

Reasons for participating in the competition(s)

This construction is part of a requalification program for the town center in order to make it more attractive. The building itself has used a large number of biosourced and local materials, wooden frame walls with insulation distributed in straw.

Building candidate in the category

Prix du public

Prix du public

Green Solutions Awards 2022-2023 / France
PDF
 building energy straw Green Solutions Awards Green Solutions Awards 2022 2023

Share :
Author of the page

Emmanuel d'Envirobat Centre


Other case studies

More

Contest

Green Solutions Awards 2022-2023 / France