,

Aconcagua

Last modified by the author on 03/05/2013 - 14:09

Renovation

  • Building Type : Collective housing > 50m
  • Construction Year : 2011
  • Delivery year :
  • Address 1 - street : mertixell 30 ad500 ANDORRA LA VELLA, Otros países
  • Climate zone : [ET] Tundra - Polar tundra, no true summer.

  • Net Floor Area : 2 300 m2
  • Construction/refurbishment cost : 340 000 €
  • Number of Dwelling : 27 Dwelling
  • Cost/m2 : 147.83 €/m2

Certifications :

  • Primary energy need
    4.5 kWhpe/m2.year
    (Calculation method : Primary energy needs )
Energy consumption
Economical buildingBuilding
< 50A
A
51 à 90B
B
91 à 150C
C
151 à 230D
D
231 à 330E
E
331 à 450F
F
> 450G
G
Energy-intensive building

See more details about this project

 http://www.pirineuinspeccioicontrol.com/1024/index.htm

Data reliability

Assessor

Stakeholders


Contracting method

Separate batches

Energy consumption

  • 4,50 kWhpe/m2.year
  • 55,00 kWhpe/m2.year
  • Primary energy needs

  • 130,00 kWhfe/m2.year
  • 212,00 kWhpe/m2.year

Envelope performance

  • 0,24 W.m-2.K-1
  • 2,90
  • n50

  • 2,40

Systems

    • Boiler fuel
    • Heat pump
    • No cooling system
    • Natural ventilation
    • No renewable energy systems

GHG emissions

  • 50,00 year(s)

Product

    Acabados / Carpintería exterior - Puertas y Ventanas

Land plot area

334,00 m2

Built-up area

100,00 %

PDF

Share :
Author of the page

jordi llovera

Director de proyectos sostenibles


Other case studies

More

Contest