Scientific University of Bordeaux

  • Tipo de proyecto : Ampliación + Renovación
  • Tipo de edificio : Escuela, instituto, universidad
  • Año de la construcción : 1961
  • Años de entrega : 2015
  • Zona climática : [Cfc] Marine Cool Winter & summer- Mild with no dry season.
  • Superficie útil : 87 000 m2
  • Coste de la construcción : 95 000 000 €
  • Número de unidades funcionales : 13 000 Estudiantes
  • Coste/m2 : 1 092 €/m2
  • Coste/Estudiantes : 7 308 €/Estudiantes


Moderado por : Veronica Restrepo

Estudios de caso similares

Escuela Infantil y Primaria Sant Martí, en Barcelona

La escuela Infantil y primaria Sant Martí, forma parte de un equipamiento multifuncional recientemente construido en el barrio de Poblenou en Barcelona. El equipamiento incluye además de la escuela, un aparcamiento público subterráneo (...)

Aulario IndUVA

La construcción del Aulario para la Escuela de Ingenierías Industriales de la Universidad de Valladolid presenta una casuística extraordinaria desde varios puntos de vista: recupera un espacio arraigado en la cultura universitaria (...)

LUCIA (Lanzadera Universitaria de Centros de Investigación Aplicada)

El edificio LUCIA, edificio CERO CO2, y CERO ENERGÍA, promovido por el Vicerrectorado de Patrimonio e Infraestructuras de  la Universidad de Valladolid, está destinado a laboratorios y centros de investigación.  Las estrategias utiliz (...)


  • Publicado 23 junio 15
    por FRANCK BOUTTE CONSULTANTS|France
    Visto 11029 veces
  • Origen :




  • Concurso

    Green Building Solutions Awards 2015

    Rénovation énergétique


    Energy renovation

    The project proposes an energy renovation solution for buildings based on a double - bioclimatic skin. This concept is currently being developed on the University campus as part of the renovation of 6 teaching and research buildings. It is the crossroads between energy performance and built heritage upgrading.

    The bioclimatic façade is an evolving principle during the year: it is adaptive, it evolves with climate. We like to say that for this performance (reducing heating requirements by a factor of 5 to 10, primary energy consumption ≤ Cep Cep ref -40 % within the meaning of thermal regulations) we do not change the building but the climate that surrounds it, and the seasons. Instead of changing the building according to the terms of environmental regulatory, bioclimatic skin turns cold climate near the surrounding when it's hot and warm when it's cold. And the buffer space created between the glass skin and the existing façade allows energy performance and occupant comfort . In addition to maintaining the large openings of the buildings without reducing their surfaces , we make generous natural light in all classrooms while renewing the interior comfort without changing the medium.


    Sistema/s de certificación


    Localización

    Cours de la libération , 33400 Bordeaux France

    CARACTERÍSTICAS TECNICAS