Partial renovation of the Ark of Defense
- by SARAH LAVAUX
- /
- 2017-06-08 15:57:46
- /
- Francia
- /
- 9495 / FR
Renovation
- Building Type : High office tower > 28m
- Construction Year : 1989
- Delivery year : 2017
- Address 1 - street : 1 Parvis de La Défense 92800 PUTEAUX, France
- Climate zone : [Cfc] Marine Cool Winter & summer- Mild with no dry season.
- Net Floor Area : 60 354 m2
- Construction/refurbishment cost : 192 000 000 €
- Cost/m2 : 3181.23 €/m2
Certifications :
-
Primary energy need :
80 kWhep/m2.an
(Calculation method : )
Redevelopment and modernization of the working spaces in the South wall. Renovations of the facades panoramic elevators. Modification of technical equipment and renovation of the premises in the infrastructures of the South Hills. Renovation of the roofs of the Ark and creation of a walkway bridge.
Sustainable development approach of the project owner
The environmental ambition is based on five axes: energy efficiency, durability of materials, long-term environmental performance, user comfort and sanitary quality of premises, so that the building is comfortable and pleasant to use. Live, easy to maintain, flexible, scalable and energy efficient.
Architectural description
Deep work on the façade for the winter heat + Insulated internal insulation + Improvement of Thermal resistance and waterproofness of the exterior joinery Increased access to daylight in traffic
Building users opinion
First feedback is positive
Stakeholders
Construction Manager
Valode et Pistre Architectes
01 53 63 22 00
http://www.v-p.comContractor
Armanéo (EIFFAGE)
Contracting method
Other methods
Energy consumption
- 80,00 kWhep/m2.an
- 137,29 kWhep/m2.an
- 301,00 kWhep/m2.an
Real final energy consumption
33,00 kWhef/m2.an
Envelope performance
- 0,79 W.m-2.K-1
- 0,17
- 1,70
Systems
- Urban network
- Heat pump
- Radiant ceiling
- Tape
- Individual electric boiler
- Urban network
- Water chiller
- Reversible heat pump
- Urban network
- Tape
- compensated Air Handling Unit
- Double flow heat exchanger
- Heat pump
Smart Building
Product
Rainwater harvesting network

Eiffage
http://www.eiffage.com/home.htmlTable 'c21_spain.innov_category' doesn't exist SELECT one.innov_category AS current,two.innov_category AS parentFROM innov_category AS oneINNER JOIN innov_category AS two ON one.parent_id = two.idWHERE one.state=1AND one.id = '23'
The rainwater from the roof of the south wall of the Ark is recovered by two sheets of 20 m3 at the lower level to each feed a sanitary column of the offices of the South wall.
The objective of this system is to reduce drinking water requirements by at least 16%.
Water management
- 800,00 m3
Indoor Air quality
Author of the page
Other case studies

House HQ1- Sant Cugat del Vâlles
- 06/02/2023
- /
- Oliver Style
- /
- 263

Learnlife Eco Hub: pop-up learning space
- 18/10/2022
- /
- Oliver Style
- /
- 837

I+D+I SORIA CAMPUS
- 25/11/2021
- /
- María Jesús González Díaz
- /
- 2751

Greenspace Gijon
- 23/11/2021
- /
- eladio rodriguez
- /
- 3297


Passive House for the Elderly
- 01/04/2021
- /
- José Miguel Asencio Asencio
- /
- 8006