Lycée Costebelle Gymnasium
- by pascale Bartoli
- /
- 2017-06-01 11:09:13
- /
- Francia
- /
- 12122 / FR
New Construction
- Building Type : Indoor gymnasium, sports hall, stadium
- Construction Year : 2014
- Delivery year : 2016
- Address 1 - street : rue du Vélodrome 83400 HYèRES, France
- Climate zone : [Csa] Interior Mediterranean - Mild with dry, hot summer.
- Net Floor Area : 2 080 m2
- Construction/refurbishment cost : 3 179 768 €
- Cost/m2 : 1528.73 €/m2
Certifications :
-
Primary energy need :
58 kWhep/m2.an
(Calculation method : RT 2012 )
Sustainable development approach of the project owner
The Costebelle gymnasium, which is part of the sustainable building approach to the Mediterranean, displays a deliberately stripped architecture.The project is based on three principles: the sobriety of use, the austerity of technical means and the affirmation of raw material.
The use value and the consideration of people and their environment are instinctive principles that guided the insertion of the project. Sharing with neighboring facilities makes possible to promote the reconstruction of the site.
Our approach to bioclimatic design is based on the reduction of consumption of the building and its ease of maintenance. An environmental logbook was given at each phase to clarify the answers proposed for each BDM label.
A specialized design office has accompanied the companies in the construction phase on the air-tightness of the building.
Architectural description
The gymnasium is in the form of a compact composition, consisting of a hall in structure and wood facing near which two volumes of raw concrete are inserted: changing rooms and depots.The geometric net developed from the basic figure of the triangle dynamically plays with the light and allows to open the sports hall on a forest of cork oaks to the south and the Costebelle stadium in the North which offers a wide clearance on the landscape .
No cladding or skin added, Larricio Pin (local resource) is left apparent holding the role of exostructure, curtain wall and sun protection.
The immaculate whiteness of the room contrasts with the shady color of the pre-shaded rafters in order to be confused with the trunks of the surrounding trees.
Building users opinion
The occupants are very satisfied
If you had to do it again?
We have a regret about the external facilities that were not realized according to the master plan drawn up by our team.
See more details about this project
https://www.dropbox.com/s/j52vfow4tpm4ygo/2016_07_26_ARCHI54_BOOK_A4_COSTEBELLE_DP.pdf?dl=1http://www.envirobat-med.net/spip/retour-en-images-visite-du-gymnase-de-costebelle-a-hyeres
http://www.prixnational-boisconstruction.org/panorama-des-realisations-en-bois/item/8900-gymnase-du-lycee-costebelle
Stakeholders
Contractor
REGION PROVENCE ALPES CÔTE D'AZUR
Contractor representative
AREA PACA
Serge Sanchiz
Designer
Architecture 54 Thierry Lombardi et Pascale Bartoli
Thierry LOMBARDI - [email protected]
http://www.architecture54.comAssistance to the Contracting Authority
Domene
Gabrielle Raynal
Other consultancy agency
AB Sud Ingénerie
Contracting method
Separate batches
Type of market
Table 'c21_spain.rex_market_type' doesn't exist
Product
Pin Laricio

Scierie Albertacce
https://www.facebook.com/Sarl-albertacce-bois-Palandri-504938849701020/Table 'c21_spain.innov_category' doesn't exist SELECT one.innov_category AS current,two.innov_category AS parentFROM innov_category AS oneINNER JOIN innov_category AS two ON one.parent_id = two.idWHERE one.state=1AND one.id = '7'
Building structure
The project required a very large quantity of class 4 wood with large sections. This volume required a reasoned approach because few sawmillers usually have such a stock, and the tender for the carpentry lot included a "Bilan Carbone" criterion in order to give priority to local timber in the choice of supplies the company. Laricio pine from Calacuccia (Corsica) being still little known stocks were available and the Carbon balance excellent.
Water management
- 425,00 m3
Comfort
Author of the page
pascale Bartoli
Architecte
Other case studies

House HQ1- Sant Cugat del Vâlles
- 06/02/2023
- /
- Oliver Style
- /
- 263

Learnlife Eco Hub: pop-up learning space
- 18/10/2022
- /
- Oliver Style
- /
- 837

I+D+I SORIA CAMPUS
- 25/11/2021
- /
- María Jesús González Díaz
- /
- 2751

Greenspace Gijon
- 23/11/2021
- /
- eladio rodriguez
- /
- 3297


Passive House for the Elderly
- 01/04/2021
- /
- José Miguel Asencio Asencio
- /
- 8006